Moralla Consulting Engineers)
South African National Roads Agency Soc Limited (SANRAL)
What was awarded
CONSULTING ENGINEERING SERVICES FOR THE RESURFACING ON NATIONAL ROUTE R37 SECTION 2 FROM MP/LP BORDER (KM 26.70) TO LYDENBURG (KM 59.70) This project is in the province of Mpumalanga and in the local municipality of Thaba ChweU and the approximate programme is for design and construction documentation to be completed by July 2025, followed by supervision of 15 months (including 3-month mobilisation period), commencing November 2025.
This contract's value is shown as unconfirmed — it's a multi-award panel or falls outside the range we can reliably verify from the published notice.
Award values are taken from the published eTenders award notice and shown as-is. We only display a figure where it's a single-award contract within a sane range; panel/multi-award totals are marked unconfirmed.