Integrators Of Systems Technology
Eskom National Transmission Company of South Africa
What was awarded
THE DESIGN, CONFIGURATION, SUPPLY, DELIVERY AND OFF-LOADING OF GE GRID AUTOMATION SPARE IEDS AS SPECIFIED ON THE ATTACHED LIST FOR LEGACY PHASE V CAPACITOR BANK PROTECTION SCHEMES FOR NTCSA, ON AN “AS-AND-WHEN” REQUIRED BASIS OVER A 5 (FIVE) YEAR PERIOD WITH AN OPTION TO EXTEND BY 5 (FIVE) YEARS. DUE TO COMPONENT OBSOLESCENCE DIRECT REPLACEMENT IEDS MAY BE SUPPLIED.
This contract's value is shown as unconfirmed — it's a multi-award panel or falls outside the range we can reliably verify from the published notice.
Award values are taken from the published eTenders award notice and shown as-is. We only display a figure where it's a single-award contract within a sane range; panel/multi-award totals are marked unconfirmed.