Nedlan Construction
ESKOM
What was awarded
An enquiry process in order to supplement the existing pre-approved panel of two (02) contractors with an additional eight (8) contractors, for Civil Works performed within the Sub Transmission portfolio, in the KwaZulu Natal (KZN), and Free State (FS) Operating Units (Central East Cluster), on an “as and when” required basis, for a period of thirty-six (36) months for construction and twelve (12) months for project completion.
This contract's value is shown as unconfirmed — it's a multi-award panel or falls outside the range we can reliably verify from the published notice.
Award values are taken from the published eTenders award notice and shown as-is. We only display a figure where it's a single-award contract within a sane range; panel/multi-award totals are marked unconfirmed.