Shula Construction
Zululand District Municipality
What was awarded
GUMBI WATER SUPPLY SCHEME UPGRADE The construction of 750m of 200mm diameter HDPE pipeline and 6500m of 200mm diameter PVC-O rising pipeline, with associated valves, chambers and fittings, new floating raw water abstraction pumpstation with two submersible pumps, installation of two new high-lift raw water pumps. Mechanical and Electrical works to upgrade and optimise the Gumbi Water Treatment Works production to 1,5ML/day, new centrifugal pumps and associated civil works, construction of 8500m of 140mm diameter u-PVC rising main to Hlambanyathi and Gumbi Extension.
Award values are taken from the published eTenders award notice and shown as-is. We only display a figure where it's a single-award contract within a sane range; panel/multi-award totals are marked unconfirmed.