Construction of Shade Net Structure and WWTW.
Casidra
Compulsory briefing — you must attend to bid
15 September 2026 at 11:00 · Brunia Wines, Stanford
In plain English
The tender is for the construction of a shade net structure and a containerised wastewater treatment works at a winery. No specific eligibility or registrations are stated.
Always check the official documentDescription
Casidra SOC Ltd invites bids for the construction of a shade net structure and a containerised Wastewater Treatment Works at Brunia Wines in Stanford, Overberg. The project requires the successful contractor to provide all necessary labour, materials, and machinery to complete the installation. Work must commence within seven days of the official appointment. A compulsory site meeting is scheduled for 15 September 2026 at 11:00 at the project location. All bids must be submitted by the closing date of 22 September 2026 at 12:00.
Full requirements
- Attendance at the compulsory site meeting is mandatory for eligibility
Contact & how to apply
Name: Marshelle Apollis
Email: mbrown@casidra.co.za
Phone: 021-863-5000
How to apply: Sealed, bound tender documents must be delivered to the Casidra SOC Ltd Head Office at 22 Louws Avenue, Southern Paarl, and placed in the designated bid box at the reception.
Related tenders
Construction of Ablution Facility at Wolwekloof Resort.
CapeNature invites bids for constructing a new main picnic ablution facility at Wolwekloof Resort, involving demolition of the existing structure and new construction. Tasks include earthworks, concrete work, roofing, plumbing, electrical installations, and paving. A compulsory site briefing is on 1 September 2026. Contractors must manage resources and personnel effectively, adhering to safety and quality standards.
Metalwork and glazing services for municipal buildings.
The Cape Winelands District Municipality requires a contractor for metalwork and glazing repair and maintenance services across various sites, including Witzenberg, Drakenstein, Stellenbosch, Breede Valley, and Langeberg. The contract is valid until 30 June 2028, with standard callouts within 48 hours and emergency responses within 5 to 24 hours. A minimum 6-month guarantee on repairs and parts is required, and all work must be documented on signed job cards.
Construction of Windsorton/Holpan Bulk Water Supply.
The Frances Baard District Municipality invites bids for constructing the Windsorton/Holpan Bulk Water Supply project. A compulsory site briefing will be held on 3 September 2026 at the municipal offices in Kimberley. Proposals must be submitted by 01 October 2026. The municipality may accept or reject bids based on internal policies.
Weltevreden Water Treatment Works Refurbishment
The Dr. JS Moroka Local Municipality invites bids for refurbishing the Weltevreden Water Treatment Works. The project includes replacing filter media, refurbishing filter nozzles, renovating the control room, structural resealing of clarifiers, replacing the backwash air blower, and installing seven new bulk meters. General building repairs such as tiling, painting, and glazing are required, along with structured training. The project must be completed according to specified mechanical engineering standards. The tender closes on 07 September 2026.
Construction of Cattle Facility and Borehole Refurbishment.
The Department of Land Reform and Rural Development invites bids for the construction of a cattle handling facility and the refurbishment of an existing borehole in Steynsburg Commonage, Walter Sisulu Local Municipality, Eastern Cape. A compulsory clarification meeting is on 25 August 2026. Tender submissions close on 11 September 2026 at 11:00.
Installation of Wastewater System at Transnet Facilities
Transnet SOC Ltd invites tenders for the installation of a Smallbore Steel Pipe Wastewater System at the Alrode and Witbank Petroleum Products Storage and Handling Facilities. The project includes mechanical, electrical, and civil engineering works, such as the supply and installation of pump sets, steel piping, and reinforced concrete structures. It involves procurement, fabrication, site testing, and commissioning over 9 months for Alrode and 8 months for Witbank. A compulsory site briefing is on 04 September 2026 at the Alrode Depot. The contract follows the NEC3 Engineering and Construction Contract (Option A) format, requiring strict adherence to safety standards, including explosion-proof motors and fire safety equipment. A 52-week defects liability period follows project completion.