Construction of Erosion Protection at Keurbooms River.
Casidra
In plain English
The tender is for the construction of erosion protection structures in the Keurbooms River. Bidders must have a CIDB contractor grading designation of 6CE or higher.
Always check the official documentDescription
Casidra invites bids for the construction of erosion protection structures at Keurbooms River, located north of Swellendam in the Western Cape. The project involves building 21 gabion groynes over a 1260-metre stretch as part of a disaster management initiative. The successful bidder must provide all necessary materials, labour, and machinery to complete the works. The project must be finished within an 11-month contract period. A non-compulsory site meeting is scheduled for 25 November 2026, and the final deadline for bid submissions is 9 December 2026.
What you need to qualify
- CIDB grading (Grade 6 Civil Engineering (6CE)) — A Construction Industry Development Board grade in the right class of works.
Full requirements
- Must hold a valid CIDB contractor grading of 6CE or higher
Contact & how to apply
Name: Ulrich Crouch
Email: ucrouch@casidra.co.za
Phone: 021-863-5000
How to apply: Interested parties must register their details and access the tender documents via the Casidra tender portal at https://tenders.casidra.co.za/tender/bid-29-2026-keurbooms-river-construction-of-erosion-protection-structures-in-keurbooms-river-swellendam/.
Related tenders
Construction of Erosion Protection Structures in Worcester
Casidra invites bids for constructing erosion protection structures at Jan Du Toits River near Worcester, Western Cape. The project involves building 46 groynes and 42 gabion structures over a 1050-metre stretch as part of a disaster management program. The successful bidder must provide all necessary labor, materials, and machinery, with an 11-month completion timeline. A compulsory site meeting is scheduled for 1 December 2026 at the Phil Susan Hall in Worcester-Vallei. Bids must be submitted by 10 December 2026.
Construction of Erosion Protection Structures in Hex River.
Casidra invites bids for constructing erosion protection structures in the Hex River, De Doorns. The project involves building 28 groynes over a 2700-metre stretch as part of a disaster management initiative near Worcester in the Western Cape. The successful contractor must provide all necessary labor, materials, and machinery to complete the project within an 11-month timeframe. A compulsory site meeting is scheduled for 1 December 2026, and the final deadline for bid submissions is 11 December 2026.
Keurboom River Rehabilitation: Debris Removal Project
Casidra SOC Ltd invites bids for the rehabilitation of the Keurbooms River in the Western Cape, focusing on debris removal from various farms. The project requires both manual labour and machinery. Work must begin within seven days of appointment. A compulsory site meeting is on 13 November 2026, with bid submissions due by 23 November 2026.
Mechanical Earthmoving in Cape Winelands Rivers
Casidra invites bids for mechanical clearing and restoration of river systems in the Cape Winelands. The project includes removing debris, vegetation, and sediment from river channels and under bridges to restore natural water flow. Tasks involve repairing breached berms, loading and hauling excess material to spoil sites, and performing emergency river rehabilitation. The successful bidder must start work within seven days of appointment and manage multiple sites if required. Compulsory site meetings are on 17 November 2026.
Erosion Control and Riverbank Rehabilitation Services
Casidra seeks professional civil engineering services for erosion control and riverbank rehabilitation in the Cape Winelands District. The project involves hydrological studies, catchment analysis, and river surveys for eight rivers affected by the 2023/2024 floods. Deliverables include a design report, engineering drawings, and aerial documentation. Coordination with local farmers and the Western Cape Department of Agriculture is required to propose sustainable sediment management and stream restoration solutions.
Mechanical Earthmoving in Cape Winelands Rivers.
Casidra invites bids for mechanical earthmoving to clear excess material from rivers in the Cape Winelands. The project includes clearing debris, vegetation, and sediment to restore natural water flow and repair breached berms. The contractor must start within seven days of appointment and manage multiple sites concurrently if awarded. Compulsory site meetings are on 17 November 2026.