Construction of Ablution Facilities and Building Refurbishment.
Mr S.Mtshengu
In plain English
The tender is for underpinning and reinforcing existing foundations with new brickwork and epoxy R6 rods. No specific eligibility criteria such as CSD, B-BBEE, CIDB, or PSIRA are stated.
Always check the official documentDescription
This project involves the structural underpinning of existing foundations and brickwork modifications at the Mbizana Traffic Department offices. The work is managed by KDA Consulting Engineers. Key tasks include drilling and installing epoxy R6 rods into 220mm load-bearing brick walls and applying polyurethane sealant between new and existing structures. Contractors must ensure foundations are not left exposed for extended periods. This work must strictly follow the technical specifications provided in drawing SK-100.
Full requirements
- Must possess technical approval for all alternative materials
Contact & how to apply
Related tenders
Construction of Sanitation Facilities at Mpharane School.
The Mvula Trust invites tenders for constructing new sanitation facilities at Mpharane Senior Secondary School in Eastern Cape, under the Sanitation 17 Programme. The project includes building 24-seat VIP ablution facilities, installing rainwater harvesting tanks, constructing stormwater drainage, walkways, and access ramps, and demolishing existing facilities. Contractors must manage local SMMEs, with 5% of construction value for local materials. The contract duration is 24 weeks, adhering to architectural and structural specifications.
Road Maintenance Panel for 18 Months - Part 2
The Winnie Madikizela-Mandela Local Municipality seeks to appoint up to 20 service providers for road maintenance over 18 months. Tasks include roadbed preparation, storm water control, concrete work, and road sign installation. Service providers will be engaged as needed, with key deliverables such as site clearing and material processing. Bidders must demonstrate technical capability and provide a qualified project team.
Repairs and Renovations to Tabankulu CHC and Mnceba Clinic.
This tender involves repairs and renovations at Tabankulu CHC and Mnceba Clinic in Alfred Nzo District, issued by the Department of Public Works and Infrastructure. Tasks include building repairs, ablution refurbishments, electrical servicing, painting, and installing an Alternative Building Technology EMS base. Completion is required within six months, with a compulsory site briefing on 29 September 2026. The project follows the JBCC Edition 6.2 contract framework.
Construction of Ablution Facility at Wolwekloof Resort.
CapeNature invites bids for constructing a new main picnic ablution facility at Wolwekloof Resort, involving demolition of the existing structure and new construction. Tasks include earthworks, concrete work, roofing, plumbing, electrical installations, and paving. A compulsory site briefing is on 1 September 2026. Contractors must manage resources and personnel effectively, adhering to safety and quality standards.
Repairs and Renovations to Tabankulu CHC and Mnceba Clinic
The Eastern Cape Department of Public Works and Infrastructure invites bids for repairs and renovations at Tabankulu CHC and Mnceba Clinic in the Alfred Nzo District. The project includes building repairs, roof waterproofing, plumbing, electrical maintenance, perimeter fencing, and the installation of an EMS base. Completion is expected within six months. A compulsory site briefing is on 29 September 2026 at both locations. All work must adhere to JBCC Edition 6.2 contract standards.
Water-efficient sanitation systems in Cape Town.
The Development Bank of Southern Africa (DBSA) seeks a contractor for the design, supply, installation, commissioning, and initial operation and maintenance of water-efficient sanitation systems in informal settlements in Cape Town. The project covers six sites with varying household capacities, requiring communal ablution blocks and treatment systems. It includes civil-interface coordination, site establishment, and a 12-month maintenance period per installation, under NEC3 contracts, with completion by 31 May 2027. Bidders must show technical capability in decentralized sanitation, provide a detailed project programme, and comply with the Occupational Health and Safety Act. The project depends on budget availability, and the DBSA may award the scope in full or part.