Pipework Installation at Kriel Power Station.
Eskom
In plain English
Eskom is conducting a tender process for unspecified goods, work, or services. Eligible bidders must comply with the criteria in the Tender Data and cannot subcontract 100% of the work.
Always check the official documentDescription
This tender is for the drawing, fabrication, supply, delivery, replacement, and installation of new pipework and fittings within the cable tunnels and pipe trenches at Eskom's Kriel Power Station. The project aims to address persistent leaks and reduce water consumption. Key deliverables include 1,200 meters of fire protection system piping, compressor plant air pipework, and water supply lines. The work must be completed within 45 working days. The project is issued by Eskom Holdings SOC Ltd. Bidders must achieve a minimum technical score of 70% to qualify.
Full requirements
- Valid ISO 9001 Quality Management System certification
- Valid ISO 3834-2 welding certification
- Certified trade test qualifications for Boilermakers and Mechanical Fitters
- Professional Engineer (ECSA) and Draughtsman certifications
- Valid Letter of Good Standing (COIDA)
- B-BBEE Sworn Affidavit signed by a Commissioner of Oaths