Supply and Install Waste Bins at Chief Dawid Stuurman Airport.
Airports Company South Africa
In plain English
Airports Company South Africa is procuring the supply, delivery, and installation of waste bins at Chief Dawid Stuurman International Airport. Bidders must ensure compliance with tax obligations and submit a priced offer.
Always check the official documentDescription
Airports Company South Africa invites bids for the supply, delivery, and installation of waste bins at Chief Dawid Stuurman International Airport. The project requires 6 weatherproof external bins, 10 pole or wall-mounted ash tray bins, and 60 free-standing outdoor waste bins with stainless steel flaps. The work must be completed at the airport premises in Walmer. Bidders must attend a non-compulsory site inspection on 10 November 2026. All items must be installed according to the specifications provided by the airport authority. The tender remains valid for 120 working days from the closing date of 16 November 2026.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- B-BBEE certificate — A B-BBEE certificate or sworn affidavit confirming your contribution level.
- VAT registration — A registered VAT vendor number with SARS.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Valid SARS Tax Compliance Status PIN
- Registered on the Central Supplier Database (CSD)
- Valid B-BBEE certificate or sworn affidavit
- Proof of valid VAT registration
- Valid security vetting clearance
Contact & how to apply
Name: Simphiwe Thophinus Jili
Email: simphwe.jili@airports.co.za
Phone: 032-436-6000
How to apply: Submit your bid via email to acsarfq@airports.co.za. Ensure the submission is divided into at least four separate attachments, each no larger than 4MB.
Related tenders
Stormwater and Drain Maintenance at Chief Dawid Stuurman Airport
The Airports Company South Africa (ACSA) seeks tenders for a 36-month maintenance project of landside and airside stormwater and drainage systems at Chief Dawid Stuurman International Airport. Tasks include debris clearing, vegetation removal, and concrete repairs. Emergency repairs must be addressed within three hours. Work will be conducted day and night, requiring proof of four similar projects completed in the last decade. Compliance with airport security, environmental, and safety protocols is mandatory, including airside training. Pricing must remain fixed, including permit costs. The tender closes on 02 November 2026.
Design & Build Modular Guard Houses at Airports
Airports Company South Africa (ACSA) seeks a contractor for the design, construction, and installation of 18 modular guardhouses at King Shaka International Airport, Chief Dawid Stuurman International Airport, and King Phalo Airport. The project includes managing the full design process, covering architectural, civil, electrical, and mechanical services, with deliverables such as health and safety plans, design drawings, and commissioning of guardhouses with ICT and security systems. The contract spans 18 months, with construction within 4 to 6 months post site access, following the NEC3 ECC Option B contract model. Work is to be done after operational hours. A compulsory briefing session is on 12 October 2026, with proposal submissions due by 12:00 PM on 10 November 2026 at King Shaka International Airport.
Panel of Suppliers for Waste Management Bins.
The Department of Forestry, Fisheries and the Environment (DFFE) seeks to establish a panel of suppliers to supply and deliver various waste management bins across all South African provinces on an as-and-when-required basis for 36 months. Deliverables include skip bins, wheelie bins, composting bins, and bulk bags. Suppliers must deliver to municipal locations within 60 days of order and demonstrate experience with at least five projects in the waste management sector, valued at a minimum of R1,000,000.00.
Supply and delivery of bins for DFFE.
The Department of Forestry, Fisheries and the Environment is establishing a panel of suppliers to provide and deliver various waste bins to municipalities across South Africa. The contract will run for 36 months on an as-needed basis. Required items include skip bins of various sizes, 240L wheelie bins, 25L composting bins, and 1-ton bulk bags. Suppliers must be able to deliver items within 60 days of receiving an order and have the capacity to offload and place bins in designated areas. This project aims to streamline waste management equipment procurement nationwide.
Design & Build Contractor for Airport Gate Replacement
Airports Company South Africa (ACSA) seeks tenders for the maintenance and replacement of mechanical taxiway and security gates at Cape Town International Airport and Kimberley Airport. The project includes preventive and corrective maintenance, design, installation, and commissioning of automated gate systems over 36 to 60 months. Key deliverables include maintaining 99% system uptime, annual statutory testing, and staff training. Bidders must provide skilled personnel, manage spares, and ensure compliance with OHS Act standards. The work involves civil, mechanical, and electrical tasks, including PLC and CCTV integration, at both airside and landside locations, adhering to strict airport security and safety protocols.
Water Security Solutions for Chief Dawid Stuurman Airport
The Airports Company South Africa (ACSA) seeks professional engineering services to enhance water security at Chief Dawid Stuurman International Airport in Gqeberha. The project involves hydrogeological studies, borehole drilling, rainwater harvesting, and designing a 500,000-liter storage reservoir and chlorination plant. The consultant will oversee the project through all six ECSA stages, including design, procurement, and construction monitoring, ensuring compliance with SANS 241:2015 standards. Deliverables include technical specifications, project management reports, and as-built drawings. The consultant will also train two ACSA trainee engineers during the 12-month project.