Setlopo Water Supply Phase 2A Project in Ward 35
HILDA KGALANYANE
Compulsory briefing — you must attend to bid
30 June 2026 at 10:00 · Opposite Setlopo Clinic, coordinates: 25° 55' 59.04" S, 25° 39' 21.11" E
In plain English
The project involves laying various sizes of uPVC pipes and installing water supply connections and valves. Bidders must have a CIDB grading of 8CE or higher.
Always check the official documentDescription
The Ngaka Modiri Molema District Municipality invites tenders for the Setlopo Water Supply Phase 2A project in Ward 35. The project involves installing over 79 kilometers of uPVC piping of various sizes and setting up 2,117 yard connections. The scope also includes the installation of essential water infrastructure such as air valves, water meters, and gate valves. This project is funded by the Municipal Infrastructure Grant. The work must be completed according to the municipality's standards. A compulsory site inspection is scheduled for 30 June 2026, and the final deadline for tender submissions is 31 July 2026.
What you need to qualify
- CIDB grading (Grade 8 Civil Engineering (8CE)) — A Construction Industry Development Board grade in the right class of works.
Full requirements
- Must hold CIDB grading of 8CE or higher
- Must attend compulsory site inspection
- Must provide proof of relevant water infrastructure project experience
- Must provide evidence of available plant and equipment
- Must provide proof of qualifications and experience for key personnel
Contact & how to apply
Name: HILDA KGALANYANE
Email: tauetsilep@nmmdm.gov.za
Phone: 018-381-9400
How to apply: Tender documents must be purchased from the Ngaka Modiri Molema District Municipality offices. Completed bids must be sealed, clearly marked with the tender number and closing date, and placed in the tender box at the municipality's office in the Mahikeng Industrial Site. Electronic submissions are not accepted.
Related tenders
Setlopo Water Supply Phase 2B Project in Wards 22 & 31
The Ngaka Modiri Molema District Municipality invites tenders for the Setlopo Water Supply Phase 2B project, involving the installation of over 80 kilometers of uPVC water pipes and 2,713 yard water meters. The project includes installing various valves and is funded by the Municipal Infrastructure Grant. A compulsory site inspection is scheduled for 30 June 2026, with a submission deadline of 31 July 2026. Bidders must demonstrate capacity, experience, and access to necessary equipment.
Installation of Water Reticulation & Yard Connections in Ward 12.
The Moretele Local Municipality invites bids for the installation of water reticulation and yard connections in Ward 12, Phase 2. The project includes excavating 5.8km of pipeline, laying 75mm uPVC pipes, and installing 421 yard connections. The contractor must formalize existing connections and remove unauthorized pipes. The work is located in Moretele, with a contract duration of 6 months and a practical completion timeline of 8 months. Bidders must attend a compulsory clarification meeting and use local labour for manual tasks.
Ruigtesloot Village Water Reticulation Phase 2
The Moretele Local Municipality invites bids for the Ruigtesloot Village Water Reticulation and Yard Connections Phase 2 project. The work involves installing water pipelines, valves, and 372 yard connections with meters, including excavation, pressure testing, and site restoration. The project is located in Ruigtesloot Village and must be completed within six months. Bidders must attend a compulsory clarification meeting on 15 June 2026. The project requires significant use of local labour and adherence to SANS standards for all water infrastructure installations.
Rural Water Supply Phase 3 in Blouberg Municipality.
The Capricorn District Municipality invites tenders for the Grootpan, Sias, Longden, Ga-Ramaswikana, and Ga-Mmamoleka Rural Water Supply Phase 3 project in Blouberg Local Municipality, Limpopo Province. The project includes constructing bulk water pipelines, concrete reservoirs, elevated steel tanks, and a containerized package water treatment plant. It also involves equipping boreholes, installing valve chambers, constructing paved roads, and implementing sanitation systems to improve water access for rural communities. The contract duration is 12 months, with a compulsory clarification meeting on 11 June 2026 at the Blouberg Fire Station. Tender submissions are due by 09 July 2026 at 11:00.
Giyani Water Reticulation Phase 2A - Contract B
The Mopani District Municipality invites contractors to bid for the Giyani Water Reticulation Phase 2A project. This tender involves the construction of water infrastructure, including installing water reticulation systems, across various locations such as Mavalani, Makhuva, and Xikhumba. The project duration ranges from 6 to 12 months, with all bids due by 22 July 2026 at 12:00. The aim is to improve water access in the specified regions.
Construction of Water Supply and Reticulation in Thulamela.
The Vhembe District Municipality invites tenders for constructing water supply and bulk water reticulation in the Thulamela Municipality, Limpopo. The project includes installing over 50 kilometers of piping, building concrete reservoirs, and establishing 1,200 yard connections. Completion is expected within 14 months, followed by a 12-month defects liability period. A compulsory site inspection is on 18 June 2026. Expertise in bulk water infrastructure is required to serve Ngwenani Themeli and surrounding areas.