Design and Installation of Water Dispensers at ACSA.
Airports Company South Africa
In plain English
The tender is for the design, supply, and installation of eight purified water dispensers at O.R. Tambo International Airport. Bidders must ensure compliance with tax obligations and submit a TCS PIN or CSD number.
Always check the official documentDescription
The Airports Company of South Africa (ACSA) invites bids for the design, supply, and installation of eight commercial-grade purified water dispensers at O.R. Tambo International Airport. The project includes site assessments, plumbing and electrical installations, and the setup of water purification and cooling systems. The contractor is responsible for testing, commissioning, and providing training to ACSA staff. All work must be completed within 12 weeks of the site handover. The project also requires the provision of as-built drawings and a 12-month defects liability period. The tender closes on 16 September 2026.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Valid SARS Tax Compliance PIN
- Registered on the Central Supplier Database (CSD)
- Successful completion of security vetting
- Relevant professional qualifications for Project Manager, Plumber, and Electrician
- Three reference letters for similar projects valued at R250,000 or more
Contact & how to apply
Name: theo nkomo
Email: theo.nkomo@airports.co.za
Phone: 011-723-1400
How to apply: Submit your application via email to ACSARfq@airports.co.za. Ensure the submission is split into multiple attachments of no more than 4MB each. All documents must be signed by an authorized person, with every page signed or stamped.
Related tenders
Engineering Services for Water System Upgrade at OR Tambo Airport
Airports Company South Africa (ACSA) seeks engineering professional services to upgrade water system pipes at O.R. Tambo International Airport over 36 months. The project includes condition assessments, design upgrades, and a real-time performance monitoring system. Deliverables include engineering designs, as-built drawings, and digital maintenance system integration. The construction phase is 18 months, requiring a team of civil, mechanical, and instrumentation engineers. The project is at a National Key Point, necessitating strict security and safety compliance. Estimated construction value is R110,000,000.00, excluding VAT.
Fire and booster pump station replacement at ORTIA.
The Airports Company South Africa (ACSA) seeks tenders for the design, supply, installation, and commissioning of fire water pump stations and a booster pump station at O.R. Tambo International Airport. The project involves mechanical, electrical, and civil works, including cloud-based monitoring and system integration, over a 24-month period. Key tasks include replacing main fire-pump sets, electrical distribution panels, and PLC/HMI control systems. A team of seven qualified professionals is required, with engineers registered with ECSA and a safety agent registered with SACPCMP. Compliance with airport security and safety protocols is mandatory. Submissions close on 05 October 2026, with a non-compulsory briefing session on 14 September 2026.
Provision of IT Wire Center UPS's and Batteries
This tender involves the supply, delivery, installation, and commissioning of UPS systems and batteries at O.R. Tambo International Airport. Issued by the Airports Company South Africa (ACSA), it aims to upgrade IT wire center power infrastructure. Key tasks include installing modular and static UPS units, replacing batteries, and removing old equipment for certified disposal. Work is to be conducted at night between 00:00 and 04:00 to minimize operational impact. The contract lasts 12 months and must comply with SANS 10142-1 standards. Successful bidders must provide training to ACSA staff and issue commissioning certificates upon completion. Pricing must remain fixed for the contract duration. The submission deadline is 18 September 2026 at 12:00 p.m.
Replacement of HVAC Equipment at O.R. Tambo Airport.
Airports Company South Africa (ACSA) invites tenders for a 24-month contract to replace HVAC equipment at O.R. Tambo International Airport. The project involves the design, supply, installation, and commissioning of 35 HVAC units, including mechanical, electrical, and control system works. Integration with the airport's Building Management System is required. Work must adhere to strict safety standards, with some tasks scheduled at night near airside areas. Deliverables include as-built drawings, operation manuals, and staff training. Bidders must provide qualified personnel and comply with SANS standards and environmental protocols. The contract is fixed-price, with completion required within 24 months.
Fuel Infrastructure Installation at ORTIA.
This tender by Airports Company South Africa (ACSA) involves the manufacture, supply, and installation of fuel infrastructure at O. R. Tambo International Airport. It aims to enhance system reliability and safety through tasks like fibre optic network reinstatement, actuator and pump replacements, and instrumentation upgrades. The 12-month contract requires adherence to safety and engineering standards, including the OHS Act and IEC/SANS regulations. Deliverables include a quality plan, project programme, as-built drawings, and maintenance manuals. Bidders must provide skilled personnel with experience in hazardous environments, and pricing is fixed for the contract duration, closing on 16 September 2026.
Replacement of split units at O.R Tambo Airport.
Airports Company South Africa (ACSA) seeks bids for the replacement, installation, and commissioning of split units, packaged units, and VRV systems at O.R Tambo International Airport over 24 months. The project requires qualified personnel, including project managers and engineers, and bidders must submit a detailed project plan and proof of experience. Pricing must remain fixed for the contract duration, with work conducted in Gauteng, South Africa.