Greater Orange Farm Phase 3D Water Infrastructure Upgrade.
Johannesburg Water
This tender closed on 10 August 2026
Bidding is no longer open. Browse open construction & engineering tenders or see the related tenders below.
Compulsory briefing has closed
Held on 14 July 2026 at 11:00 · Turbine Hall, 65 Ntemi Piliso Street, Newtown, Johannesburg, 2001, Venue: Auditorium. Attendance was required to bid.
In plain English
Johannesburg Water is procuring the supply and delivery of small diameter valves on an as and when required basis for 36 months. There are no specific eligibility requirements stated.
Always check the official documentDescription
Johannesburg Water is seeking service providers for four distinct projects. These include the Greater Orange Farm Phase 3D water infrastructure upgrade, the upgrading of the Inchanga sewer rising main, the supply of small diameter valves, and the installation and servicing of firefighting equipment. The work will take place across various locations in Johannesburg. The contracts for valves and firefighting equipment will run for a period of thirty-six months. All projects require attendance at compulsory briefing sessions held at designated venues in Johannesburg before the respective closing dates in August 2026.
What you need to qualify
- CIDB grading (Grade 8 Civil Engineering (8CE)) — A Construction Industry Development Board grade in the right class of works.
Full requirements
- Must attend compulsory briefing session
- CIDB grading of 8CE or higher for infrastructure projects
Contact & how to apply
Name: Jonathan Kekana
Email: jonathan.kekana@jwater.co.za
Phone: 011-688-1588
How to apply: Download tender documents from the Johannesburg Water website. Submit your bid in a sealed envelope, clearly marked with the tender number and closing date, into the tender box at the entrance to Turbine Hall, 65 Ntemi Piliso Street, Newtown, for the attention of the Supply Chain Management Unit.
Related tenders
Completion of Soweto Infrastructure Upgrade Project.
Johannesburg Water seeks service providers for infrastructure and supply projects, including the Soweto Infrastructure Upgrade, supply of pipes, water meter spares, repair clamps, laboratory equipment, and marketing services. Contracts are for 36 months on an as-needed basis across Johannesburg, with briefing sessions at Turbine Hall or Cydna Laboratory. Closing dates are in September 2026.
Infrastructure Renewal for Van Wyksrust Sewer Pump Station.
Johannesburg Water invites bids for the renewal, refurbishment, and repair of the Van Wyksrust Sewer Pump Station as part of the Olifantsvlei Wastewater Treatment Works plan. The project is located in Johannesburg, with a briefing session at the Olifantsvlei Wastewater Treatment Works Administration Building on 25 August 2026. Submissions are due by 10 September 2026 at 10:30.
Supply and Delivery of HDPE Pipes and Fittings.
Johannesburg Water (SOC) Ltd seeks a service provider for the supply and delivery of HDPE pipes and fittings on an 'as and when' required basis for a period of 36 months. This tender is part of multiple infrastructure upgrade projects, including the Soweto Infrastructure Rehabilitation. Work will occur across various Johannesburg locations, with compulsory briefing sessions required. Closing dates range from 15 September 2026 to 30 September 2026.
Supply and Delivery of Steel Pipes and Fittings.
Johannesburg Water invites bids for the supply, delivery, and offloading of fabricated steel pipes and fittings on an 'as and when' required basis for a period of 36 months. The work will take place in Johannesburg, and all tenders require attendance at a compulsory briefing session. Bids must be submitted to the Supply Chain Management Unit at Turbine Hall, Newtown, by the closing dates in September 2026.
Supply and delivery of water meter spares.
Johannesburg Water invites bids for the supply and delivery of bulk water flow meter spares, accessories, and related instrumentation components on an 'as and when' required basis for a period of 36 months. The work will take place across Johannesburg, with compulsory briefing sessions at Turbine Hall or Cydna Laboratory.
Construction of Water Supply Infrastructure in Jozini.
The uMkhanyakude District Municipality invites tenders for Phase 1 of the KwaJobe Community Water Supply Scheme. The project includes constructing a 2ML reinforced concrete reservoir, installing 4km of 350/400mm bulk gravity pipelines, and 19km of 50-110mm reticulation lines. Additional works involve a steel water pipe bridge, two 100kL elevated steel tanks, valve chambers, fencing, and access roads in Wards 3, 4, and 5 of the Jozini Local Municipality. The contract duration is 10 months, funded by the Municipal Infrastructure Grant, and requires adherence to EPWP labour standards.