Construction & Engineering 17 Aug 2026Upgrade of Water Pipeline from Forever Resort to Three Rondavels. The Mpumalanga Tourism and Parks Agency (MTPA) seeks a service provider for upgrading the water pipeline from Forever Resort to Three Rondavels. The project includes clearing 4,000 m² of servitude, installing 4,000 m of 50mm galvanized steel pipeline, constructing a 6m high structural steel tank stand, and installing two 10,000 litre LLDPE storage tanks and a 5.5 kW 3-phase centrifugal pump set. It also involves pressure testing, system disinfection, and installing valves and meters. The project, located in Mpumalanga Province, must be completed within four months and is a re-measurable contract.
Supply Chain Management Unit, Procurement Office, Halls’ Gateway, Mataffin, MTPA Finance Block E Mbo-Mataffin-Mbombela-1200R 2 500 000