Construction & Engineering 23 Sept 2026Installation of Wastewater System at Transnet Facilities Transnet SOC Ltd invites tenders for the installation of a Smallbore Steel Pipe Wastewater System at the Alrode and Witbank Petroleum Products Storage and Handling Facilities. The project includes mechanical, electrical, and civil engineering works, such as the supply and installation of pump sets, steel piping, and reinforced concrete structures. It involves procurement, fabrication, site testing, and commissioning over 9 months for Alrode and 8 months for Witbank. A compulsory site briefing is on 04 September 2026 at the Alrode Depot. The contract follows the NEC3 Engineering and Construction Contract (Option A) format, requiring strict adherence to safety standards, including explosion-proof motors and fire safety equipment. A 52-week defects liability period follows project completion.
Transnet Pipelines Alrode and Witbank Depot - Gauteng - Alberton - 1449R 50 000 000