Automated Meter Reading System Implementation and Support.
Airports Company South Africa
In plain English
The Airports Company South Africa is procuring 60 months of comprehensive system management and support services for the Automated Meter Reading system at two airports. The tender document does not specify eligibility requirements such as CSD, B-BBEE, CIDB, or PSIRA.
Always check the official documentDescription
Airports Company South Africa (ACSA) invites tenders for the design, supply, installation, and 60-month maintenance of an Automated Meter Reading (AMR) system for water and electricity. The project covers multiple airports, including OR Tambo, King Phalo, Chief Dawid Stuurman, Cape Town, George, Upington, and Kimberley. The scope includes replacing legacy meters with smart technology, integrating billing software, and providing ongoing system management, cybersecurity, and preventative maintenance. The contract is divided into two parts: a 12-month implementation phase (NEC3 ECC Option B) and a 60-month operational support phase (NEC3 TSC Option A). Key deliverables include monthly performance reporting, OEM-supported technical assistance, and staff training. The project requires professional engineering oversight and adherence to strict airport security and safety standards.
What you need to qualify
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 7 Electrical Engineering (Building) (7EB)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Valid CIDB grading of 7EB, 7EP or higher
- Valid SARS Tax Compliance Status PIN
- Valid COIDA Letter of Good Standing
- Aviation liability insurance with minimum R300,000 indemnity
- Formal OEM support or partnership agreement
- Key personnel must hold ECSA, SACPCMP, PIRB, or Wireman’s License
- Valid South African Inspection Authority certificates for hazardous equipment
- Signed OHS Act Section 37(2) and EMS 048 agreements
- Attendance at the compulsory briefing session
Contact & how to apply
Name: Patricia Nkambule
Email: Patricia.Nkambule@airports.co.za
Phone: 011-723-1400
How to apply: Submit printed copies (1 original and 1 copy) and an electronic USB drive to the Reception, 3rd Floor Western Precinct, Aviation Park, 1 Jones Road, Kempton Park, Johannesburg. Ensure all envelopes are sealed and clearly marked with the tender reference number and bidder details.
Related tenders
Automated Fuel Management System for Airports.
The Airports Company South Africa (ACSA) seeks proposals for designing, constructing, and commissioning an automated fuel management system at George, King Phalo, Bram Fischer, Kimberley, and Upington airports. The project includes installing fuel meters, tank gauging instruments, and overfill protection systems, integrating SCADA systems, developing web-based monitoring software, and providing operator training. The contract is for seven months, requiring engineering oversight to meet international safety standards for aviation fuel handling. Deliverables include as-built drawings, commissioning reports, and maintenance manuals.
Supply and Maintenance of Security Platform for ACSA.
Airports Company South Africa (ACSA) seeks bids for the supply, installation, commissioning, support, and maintenance of an Intelligent Integrated Security Platform across all nine ACSA airports and the corporate office. The project involves implementing a centralized security system integrating CCTV, access control, and perimeter detection. The contract is for 60 months, including a 9-month implementation period and 24/7/365 support. The system must meet cybersecurity and aviation safety standards, and bidders should have at least five years of experience in similar projects.
Integrated Aviation Security Screening Solution for ACSA.
Airports Company South Africa (ACSA) seeks a comprehensive aviation security screening solution across its national airport network, including OR Tambo, Cape Town, and King Shaka International Airports. The project involves the design, supply, installation, and maintenance of advanced security technology such as 3D X-ray machines, full-body scanners, and automated tray handling lanes. The contract spans a ten-year lifecycle, focusing on system integration, cybersecurity, and staff training to enhance passenger throughput and security detection. Bidders must ensure 99% operational uptime and adhere to strict aviation security standards.
Generator and LV Systems Maintenance at ACSA.
Airports Company South Africa (ACSA) seeks tenders for a six-month contract for maintenance and repair of generators and Low Voltage (LV) systems at Chief Dawid Stuurman International Airport. The contract includes preventative and corrective maintenance, requiring technical competence and compliance with OHS Act and SANS standards. Deliverables include maintenance reports, infrared scan results, and a monthly maintenance roster, with a fixed price list and 30-day payment terms.
Maintenance of Roof Ventilators and HVAC Systems at ACSA.
Airports Company South Africa (ACSA) seeks tenders for maintaining roof ventilators and HVAC mechanical systems at O.R. Tambo International Airport over six months. The project includes preventative, corrective, and breakdown maintenance for chillers, cooling towers, air handlers, and dampers. Contractors must ensure system reliability, adhere to response times for landside and airside operations, and comply with safety and OEM standards. A functionality score of at least 80 out of 100 is required for further evaluation, and pricing must remain fixed for the contract duration.
Maintenance of Power Network at Upington Airport
The Airports Company South Africa (ACSA) seeks tenders for the preventative and corrective maintenance of the Medium Voltage and Low Voltage power reticulation network at Upington International Airport over a 36-month period. The project includes routine maintenance of switchgear, transformers, and SCADA systems, as well as emergency breakdown repairs. Deliverables include maintenance reporting, root cause analysis for failures, and updated asset registers. Compliance with safety standards and fixed pricing for the contract duration are required. A compulsory site inspection is scheduled for 08 September 2026.