Supply and Installation of Shaded Ports at Airport
Airports Company South Africa
In plain English
The tender is for the supply and installation of shaded ports at Chief Dawid Stuurman International Airport. Bidders must have a CIDB contractor grading of 3GB or higher.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites bids for the supply and installation of shaded ports at the Chief Dawid Stuurman International Airport. The project includes the design, construction, and installation of 600 square meters of shaded ports, including reinforced concrete aprons, drainage systems, and lighting. The contract duration is six months, followed by a 12-month defects liability period. Bidders must demonstrate technical competence and achieve a minimum functionality score of 70 out of 100. The project will be evaluated using the 80/20 preference point system. All work must comply with strict airport safety, environmental, and security regulations.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Registered company — An active CIPC-registered company in good standing.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 3 General Building (3GB)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Valid CIDB contractor grading of 3GB or higher
- Valid SARS Tax Compliance Status or CSD registration
- Valid COIDA Letter of Good Standing
- CIPC registration and relevant legal entity documentation
- Proven experience via reference letters for similar projects
- Project Principal (NQF 7) and Supervisor (NQF 6) certified qualifications
Contact & how to apply
Name: Joseph Rulash
Email: joseph.rulash@airports.co.za
Phone: 084-434-0582
How to apply: Download documents from the National Treasury eTender portal or ACSA website. Submit one original, one copy, and an electronic version (USB) to the Tender Box at the Aeropark Office Complex, Block A, 1st Floor, Allister Miller Drive, Walmer, Gqeberha, by 28 August 2026 at 13:00 PM.
Related tenders
Supply and Installation of Perimeter Fence Lighting at Airport
The Airports Company South Africa (ACSA) invites tenders for the supply and installation of perimeter fence line obstacle lighting at Chief Dawid Stuurman International Airport. The project includes installing aviation obstacle lights, galvanized support poles, cabling, and concrete footings to ensure safety on runway approaches. It is classified as electrical engineering infrastructure with a contract duration of three months and a 26-week defects liability period. Bidders must demonstrate technical competence, including employing a qualified lead designer and a project supervisor with an N6 electrical engineering qualification. The project requires adherence to strict safety and environmental regulations, including airside induction training for all personnel. The tender follows an 80/20 preference point system, and bidders must achieve a minimum of 70 out of 100 points in the functionality evaluation to qualify for further consideration. All rates provided must remain fixed for the duration of the contract.
Design and Install Solar PV Plant at King Shaka Airport
The Airports Company South Africa (ACSA) seeks tenders for the design, supply, installation, commissioning, and maintenance of a 2 MWp Photovoltaic Solar Plant at King Shaka International Airport. The project includes a 36-month construction phase and a 5-year operation and maintenance period. Key tasks involve structural roof modifications, electrical integration, security system installation, and performance monitoring. The work is located at the airport's landside long-stay parking area. A compulsory site briefing is scheduled for 30 July 2026. The project requires adherence to technical standards, including 22% module efficiency and 99.5% system availability, under the NEC3 Engineering and Construction Contract. Security screening for personnel and NERSA registration are mandatory, with contractor-led training for ACSA staff.
Refurbishment of Aircraft Docking System at CTIA.
The Airports Company South Africa (ACSA) seeks tenders for refurbishing and reinstating support infrastructure for the Bravo and Charlie Apron Aircraft Docking System at Cape Town International Airport. The project includes civil and electrical works, such as installing structural steel masts, concrete foundations, and power supply systems. The contractor will handle design, construction, and documentation over 18 months, with a 2-month site operation period, adhering to airport safety protocols. Deliverables include As-Built drawings, maintenance schedules, and a final project report, under the NEC3 ECC Option A.
LED Lighting Installation at King Phalo Airport.
Airports Company South Africa (ACSA) seeks a contractor for the supply, delivery, and installation of LED lights at King Phalo Airport, covering areas such as shade parking, fire station, and substations. The project requires a CIDB grading of 2EB or higher, with a compulsory briefing on 28 July 2026 and a closing date of 07 August 2026. Compliance with safety and environmental standards is mandatory.
Electrical Contractor for Assessment and Certification at ACSA.
The Airports Company South Africa (ACSA) seeks an electrical contractor for the assessment, verification, and certification of Low Voltage electrical installations at Cape Town International Airport. The contractor will conduct audits, issue Certificates of Compliance, and maintain electrical infrastructure over a 24-month period. A full-time site team, including a contract manager and two qualified electricians, is required to ensure compliance with SANS 10142-1 standards. Deliverables include technical reports, updated electrical drawings, and operations manuals. The project is a fixed-price contract, and personnel must undergo airside safety and security training.
Design and Install Solar PV Plant at Cape Town Airport
The Airports Company South Africa (ACSA) seeks bids for the design, supply, installation, commissioning, and maintenance of a 2.5 MWp Solar PV plant at Cape Town International Airport. The project includes roof-mounted solar modules, inverters, and electrical systems to meet the airport's energy needs. Deliverables include a functional solar plant, performance monitoring, and a maintenance program. Compliance with IEC and SANS standards is required, with completion in 36 months. A compulsory site inspection is necessary for eligibility. The contractor will handle all engineering, procurement, and construction tasks, including grid connection approvals and environmental assessments.