LED Lighting Installation at King Phalo Airport.
Airports Company South Africa
In plain English
The tender is for the supply, delivery, and installation of LED lights at King Phalo Airport. Only tenderers with a CIDB contractor grading of 2EB or higher may submit tender offers.
Always check the official documentDescription
Airports Company South Africa (ACSA) has issued two tenders for King Phalo Airport. The first involves the supply and installation of LED lighting across various airport facilities, including parking areas and substations. The second project covers the supply, installation, and commissioning of a new SCADA panel for the airport's electrical complex, including the removal of old equipment and staff training. Both projects require strict adherence to safety and environmental standards. The LED lighting project requires a CIDB grading of 2EB or higher and includes a compulsory briefing on 28 July 2026, with a closing date of 07 August 2026. The SCADA panel project is a 12-month contract under the NEC3 agreement. Both tenders require fixed-price submissions and compliance with the Occupational Health and Safety Act.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Registered company — An active CIPC-registered company in good standing.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- B-BBEE certificate — A B-BBEE certificate or sworn affidavit confirming your contribution level.
- CIDB grading (Grade 2 Electrical Engineering (Building) (2EB)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Valid SARS Tax Compliance Status
- Registered on the Central Supplier Database (CSD)
- Valid COIDA Letter of Good Standing
- CIDB registration Grade 2EB or higher
- Valid B-BBEE certificate or sworn affidavit
- CIPC company registration and director identity documents
- Public Liability and Professional Indemnity insurance of R5 million
- Bank rating letter and auditor-certified letter of solvency
- ISO 9001 quality management system certification
Contact & how to apply
Name: Helen Mahlangu
Email: helen.mahlangu@airports.co.za
Phone: 079-696-4621
How to apply: For the LED lighting tender, submit the completed bid documents via email to acsarfq@airports.co.za by the closing date. For the SCADA panel tender, submit the signed Form of Offer and Acceptance as specified in the tender data documents.
Related tenders
Replacement of AGL LED Fittings at Bram Fischer Airport.
The Airports Company South Africa (ACSA) seeks bids for replacing Airfield Ground Lighting (AGL) LED fittings at Bram Fischer International Airport. The project involves supplying, installing, and commissioning runway and apron edge lighting, including infrastructure like cabling, sleeves, and manholes. It requires on-site training for maintenance staff and a 12-month defect-free maintenance period. Completion is expected within 24 months, with a compulsory site inspection for bidders. All work must meet safety, environmental, and quality standards, with fixed pricing throughout the contract.
Supply and Install SCADA Panel at King Phalo Airport
The Airports Company South Africa (ACSA) invites tenders for the supply, delivery, installation, configuration, and testing of a new SCADA panel at the electrical complex of King Phalo Airport in East London. The project includes decommissioning the existing panel, integrating the new system, site acceptance testing, and operator training. The contract duration is 12 months under the NEC3 Engineering and Construction Contract. Bidders must provide a disposal certificate for the old equipment and have specific engineering qualifications. Pricing is fixed for the contract duration, with a 10% retention fee held for 52 weeks post-completion.
Maintenance of Airfield Ground Lighting at Cape Town Airport.
The Airports Company South Africa (ACSA) seeks bids for a 12-month contract to maintain Airfield Ground Lighting (AGL) at Cape Town International Airport. The contract includes preventative and corrective maintenance of lighting systems, current regulators, and signage, with tasks like PAPI light calibration and AGL control system upkeep. Work is primarily at night for safety, requiring a skilled team of electricians. Compliance with aviation safety and electrical standards is mandatory. The contract, valued at R5,000,000.00, covers routine services and ad-hoc repairs. The tender closes on 22 July 2026, with a compulsory site meeting for bidders.
Generator Replacement at King Phalo Airport.
The Airports Company South Africa (ACSA) seeks professional electrical engineering services for a generator replacement program at King Phalo Airport. The project includes load flow studies, system design, and site supervision. Key tasks involve removing old generator radiators, installing new units, and replacing a diesel tank. The 24-month contract covers project initiation, design, procurement, and implementation phases, requiring expertise in critical airport infrastructure. The consultant will oversee the contractor to ensure quality and cost control, maintaining the airport's electrical network integrity.
Service and Repair of Civil Equipment at King Phalo Airport
The Airports Company South Africa (ACSA) seeks a service provider for ad-hoc service and repair of civil equipment at King Phalo Airport for thirty-six months. The scope includes maintenance of bush cutters, slashers, paint machines, chainsaws, and ride-on mowers, ensuring compliance with aviation safety and environmental regulations. Deliverables include monthly progress and service reports, and skilled personnel. Work occurs during standard business hours, Monday to Friday. A compulsory site inspection is on 09 July 2026. Bidders must provide a fully priced activity schedule.
Septic Tank Eradication at King Phalo Airport
The Airports Company South Africa (ACSA) seeks professional service providers for the septic tank eradication project at King Phalo Airport. The project includes site assessments, geotechnical and structural surveys, and the design of new wastewater management infrastructure. Responsibilities include decommissioning existing septic tanks, installing new systems, and site reinstatement. The contract follows the NEC3 Professional Services Contract over two years, requiring engineering designs, Bills of Quantities, as-built drawings, and final project reports. Compliance with health, safety, and environmental regulations is mandatory. A compulsory site inspection is on 17 July 2026, with the tender closing on 24 July 2026.