Water Metering at Chief Dawid Stuurman Airport
Airports Company South Africa
In plain English
The tender is for the installation, commissioning, and maintenance of water meters at Chief Dawid Stuurman International Airport. Eligible bidders must demonstrate proven experience in plumbing and water meter installation and maintenance.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites tenders for the supply, installation, and maintenance of Automated Meter Reading (AMR) water meters at Chief Dawid Stuurman International Airport. The project involves removing old meters and installing new technology across 31 airport locations, including hangars, cargo facilities, and commercial buildings. Key deliverables include pressure and flow testing, commissioning reports, and a 24-month warranty period with 24-hour fault response. The work must comply with SANS 1529 and SANS 1223 standards. A compulsory site inspection is scheduled for 9 October 2026, and the tender closes on 16 October 2026. Bidders must demonstrate technical competence and provide a detailed resource proposal. The contract is a once-off service agreement, and all pricing must remain fixed for the duration of the project.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 2 Specialist Works (2SW)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Valid SARS Tax Compliance Status or CSD registration
- Valid COIDA Letter of Good Standing
- CIDB contractor grading of 2SO or higher
- Proof of insurance commitment
- Comprehensive safety and environmental compliance documentation
Contact & how to apply
Name: Joseph Rulash
Email: joseph.rulash@airports.co.za
Phone: 084-434-0582
How to apply: Submit your bid in a sealed envelope to the Tender Box at the Reception, Administrator Office, Aeropark Office Complex, Block A, 1st Floor, Allister Miller Drive, Walmer, Eastern Cape. You must include one original, one copy, and a USB flash drive. Sign the Tender Deposit Register upon delivery.
Related tenders
Automated Meter Reading System Implementation and Support.
Airports Company South Africa (ACSA) seeks a contractor for the design, supply, installation, and maintenance of an Automated Meter Reading (AMR) system for water and electricity across multiple airports. The project includes replacing legacy meters with smart technology, integrating billing software, and providing ongoing system management and maintenance. It involves a 12-month implementation phase and a 60-month operational support phase, requiring engineering oversight and adherence to airport security and safety standards.
Automated Fuel Management System for Airports.
The Airports Company South Africa (ACSA) seeks proposals for designing, constructing, and commissioning an automated fuel management system at George, King Phalo, Bram Fischer, Kimberley, and Upington airports. The project includes installing fuel meters, tank gauging instruments, and overfill protection systems, integrating SCADA systems, developing web-based monitoring software, and providing operator training. The contract is for seven months, requiring engineering oversight to meet international safety standards for aviation fuel handling. Deliverables include as-built drawings, commissioning reports, and maintenance manuals.
Design & Build Contractor for Airport Gate Replacement
Airports Company South Africa (ACSA) seeks tenders for the maintenance and replacement of mechanical taxiway and security gates at Cape Town International Airport and Kimberley Airport. The project includes preventive and corrective maintenance, design, installation, and commissioning of automated gate systems over 36 to 60 months. Key deliverables include maintaining 99% system uptime, annual statutory testing, and staff training. Bidders must provide skilled personnel, manage spares, and ensure compliance with OHS Act standards. The work involves civil, mechanical, and electrical tasks, including PLC and CCTV integration, at both airside and landside locations, adhering to strict airport security and safety protocols.
Maintenance of Roof Ventilators and HVAC Systems at ACSA.
Airports Company South Africa (ACSA) seeks tenders for maintaining roof ventilators and HVAC mechanical systems at O.R. Tambo International Airport over six months. The project includes preventative, corrective, and breakdown maintenance for chillers, cooling towers, air handlers, and dampers. Contractors must ensure system reliability, adhere to response times for landside and airside operations, and comply with safety and OEM standards. A functionality score of at least 80 out of 100 is required for further evaluation, and pricing must remain fixed for the contract duration.
Fire and booster pump station replacement at ORTIA.
The Airports Company South Africa (ACSA) seeks tenders for the design, supply, installation, and commissioning of fire water pump stations and a booster pump station at O.R. Tambo International Airport. The project involves mechanical, electrical, and civil works, including cloud-based monitoring and system integration, over a 24-month period. Key tasks include replacing main fire-pump sets, electrical distribution panels, and PLC/HMI control systems. A team of seven qualified professionals is required, with engineers registered with ECSA and a safety agent registered with SACPCMP. Compliance with airport security and safety protocols is mandatory. Submissions close on 05 October 2026, with a non-compulsory briefing session on 14 September 2026.
Design of Rainwater Harvesting at King Phalo Airport
The Airports Company South Africa (ACSA) invites tenders for the design and implementation of a rainwater harvesting system at King Phalo Airport. The project aims to provide an alternative water supply for terminal ablutions, car rental facilities, and emergency services. The successful consultant will manage the project lifecycle over 40 months, covering stages from inception to final project close-out. Key deliverables include technical reports, design drawings, cost estimates, and as-built documentation. Bidders must demonstrate technical expertise, with key personnel holding relevant professional registrations and degrees. The project requires adherence to national water and safety standards and a commitment to utilizing local labor within a 50 km radius of the airport.