Painting services at King Phalo Airport.
Airports Company South Africa
In plain English
Airports Company South Africa is procuring services for painting runways, taxiways, aprons, service roads, and parking at King Phalo Airport for three years. The tender is open to contractors who meet the requirements specified in the tender document.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites tenders for the painting of runways, taxiways, aprons, service roads, and parking areas at King Phalo Airport in East London. This is a three-year term service contract. The scope includes applying markings to runways, taxiways, and various parking zones using professional painting machinery. Work must be performed after airport operational hours to ensure safety and proper drying. The contractor must provide a skilled team, including a qualified supervisor and experienced general workers. All personnel must be medically fit and hold valid airport permits. The project requires strict adherence to safety and environmental regulations. Payment is based on completed activities, with adjustments made annually according to the Consumer Price Index.
What you need to qualify
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- B-BBEE certificate — A B-BBEE certificate or sworn affidavit confirming your contribution level.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Maintain Public Liability, Motor Vehicle, and COID insurance
- Possess valid B-BBEE certificate and Tax Clearance Certificate
- Hold valid airport permits and medical fitness certificates for all staff
- Provide three reference letters for similar asphalt marking projects
- Supervisor must hold National Diploma or N3-N6 in Civil/Construction
Contact & how to apply
Related tenders
Herbicide Application at King Phalo Airport.
Airports Company South Africa (ACSA) seeks tenders for herbicide application services at King Phalo Airport, East London. The project includes weed control on runways, taxiways, aprons, parking areas, and access roads over a three-year period. Work must be conducted during specific hours, including after-hours for airside locations. Deliverables include monthly herbicide application, weed removal, safety file management, and progress reporting. Chemicals must be SABS approved. Evaluation is based on a functionality threshold of 60 points, focusing on company experience and personnel qualifications. Submissions close on 26 August 2026 at 13:00 PM.
LED Lighting Installation at King Phalo Airport.
Airports Company South Africa (ACSA) seeks a contractor for the supply, delivery, and installation of LED lights at King Phalo Airport, covering areas such as shade parking, fire station, and substations. The project requires a CIDB grading of 2EB or higher, with a compulsory briefing on 28 July 2026 and a closing date of 07 August 2026. Compliance with safety and environmental standards is mandatory.
Professional Services for Power Factor Correction Replacement
Airports Company South Africa (ACSA) seeks professional electrical engineering services to replace Power Factor Correction systems at King Phalo Airport and Chief Dawid Stuurman International Airport over three years. The contract includes onsite assessments, design, project management, construction supervision, and commissioning of new systems. Deliverables include technical specifications, project plans, as-built drawings, and staff training. Compulsory site inspections are required, and the project team must include a qualified Project Manager and a professionally registered Project Engineer. The tender uses an 80/20 preference point system and requires a minimum functionality score of 60 points for evaluation.
Supply and Install SCADA Panel at King Phalo Airport
The Airports Company South Africa (ACSA) invites tenders for the supply, delivery, installation, configuration, and testing of a new SCADA panel at the electrical complex of King Phalo Airport in East London. The project includes decommissioning the existing panel, integrating the new system, site acceptance testing, and operator training. The contract duration is 12 months under the NEC3 Engineering and Construction Contract. Bidders must provide a disposal certificate for the old equipment and have specific engineering qualifications. Pricing is fixed for the contract duration, with a 10% retention fee held for 52 weeks post-completion.
Supply and Installation of Perimeter Fence Lighting at Airport
The Airports Company South Africa (ACSA) invites tenders for the supply and installation of perimeter fence line obstacle lighting at Chief Dawid Stuurman International Airport. The project includes installing aviation obstacle lights, galvanized support poles, cabling, and concrete footings to ensure safety on runway approaches. It is classified as electrical engineering infrastructure with a contract duration of three months and a 26-week defects liability period. Bidders must demonstrate technical competence, including employing a qualified lead designer and a project supervisor with an N6 electrical engineering qualification. The project requires adherence to strict safety and environmental regulations, including airside induction training for all personnel. The tender follows an 80/20 preference point system, and bidders must achieve a minimum of 70 out of 100 points in the functionality evaluation to qualify for further consideration. All rates provided must remain fixed for the duration of the contract.
Supply and Install 180kVA UPS at King Phalo Airport.
The Airports Company South Africa (ACSA) seeks tenders for supplying, delivering, installing, and commissioning a 180kVA industrial UPS at the 11 Substation and a 15kVA UPS for check-in counters at King Phalo Airport. The project includes removing existing equipment, providing a disposal certificate, and integrating new systems. The contract, under NEC3 Engineering and Construction Contract (Option A), must be completed within six months. A compulsory site meeting is required, and pricing must remain fixed for the contract duration.