Construction of Luthilunye Phase 3 Electrification Project.

Emadlangeni Municipality

In plain English

The tender is for the construction of Luthilunye Phase 3 electrification project for 114 household connections in Ward 01. Eligible bidders are those registered with the CIDB with a grading designation of 5EP or higher, including joint ventures meeting specific criteria.

Always check the official document
Closing date
13 November 2026
Location
40-Utrecht-Utrecht-2980
Estimated value
R 6 500 000
Published
30 October 2026
Tender no.
MN13-2026-27

Description

The Emadlangeni Municipality is inviting bids for the Luthilunye Phase 3 Electrification Project located in Ward 01. This project involves the electrical connection of 114 households. The work requires a contractor capable of handling the specified electrification infrastructure. All project activities must be completed in accordance with the municipality's requirements. The deadline for all submissions is 12h00 on 13 November 2026.

What you need to qualify

  • CIDB grading (Grade 5 Electrical Engineering (Infrastructure) (5EP)) — A Construction Industry Development Board grade in the right class of works.

Full requirements

  • Valid CIDB registration required.
  • Minimum CIDB contractor grading of 5EP or higher.
  • Joint ventures: All members must have CIDB registration; lead partner must hold 5EP.

Contact & how to apply

Name: Bongani Khumalo

Email: khumalob@emadlangeni.gov.za

Phone: 034-331-3616

How to apply: Sealed envelopes must be physically delivered to the Tender Box located at the Municipal Offices, 34 Voor Street, Utrecht, 2980. Late, telephonic, facsimile, or emailed submissions will not be accepted.

Download tender documents

Related tenders

Electrical & Plumbing13 Nov 20267d left

Construction of Balgray Electrification Project for 41 Households.

The Emadlangeni Local Municipality invites tenders for construction work classified as 3EP in Utrecht. The project involves specialized electrical infrastructure services. Submissions must be finalized by 13 November 2026 at 12h00. Contractors must demonstrate technical capacity and valid registration.

40-Utrecht-Utrecht-2980R 3 000 000
Electrical & Plumbing20 Nov 2026

Electrification Project in eMangwaneni, Ward 3

The Okhahlamba Local Municipality seeks a contractor for electrifying 140 households in eMangwaneni, Ward 3. The project includes installing medium voltage infrastructure, such as transformers, overhead lines, and smart meters. The contractor will handle testing, commissioning, and uploading connection data to the Eskom system, adhering to Eskom standards and safety regulations. Completion is expected within four months, with key deliverables including electrical lines, household connections, and as-built drawings. All materials must be new and sourced from Eskom-approved suppliers.

259 Kingsway Street-Bergville-Bergville-3350R 3 500 000
Construction & Engineering13 Nov 20267d left

Professional Services for Umlazi S1-3 Housing Project.

The eThekwini Municipality seeks professional services for constructing 300 housing units in Umlazi S1, 2, and 3 (Ward 88) over 36 months. Required professionals include a Project Manager, Structural Engineer, Geotechnical Engineer, Social Facilitator, and Land Surveyor. Deliverables include site planning, NHBRC-compliant designs, stakeholder engagement, and quality monitoring. Bidders must have experience with at least three similar projects in the last five years. The project includes semi-detached, row, and single-storey units. Submissions close on 13 November 2026 at 11:00.

166 K E Masinga Road (Formerly Old Fort Road)-Durban-KZN-4001R 25 000 000
Electrical & Plumbing23 Nov 2026

Panel for Electrical Network Maintenance and Upgrading.

The Emalahleni Local Municipality in the Eastern Cape seeks a panel of three service providers for electrical network maintenance and upgrades over 36 months on an as-and-when-required basis. The work involves supporting electrical infrastructure to ensure the network remains functional and updated. Tender number ELM/4/10/2026T must be submitted by 12:00 on November 23, 2026.

Cacadu Extension-Lady frere-Cacadu-5410R 3 500 000
Electrical & Plumbing19 Nov 2026

Panel Contract for Electro-Mechanical Services.

Sekhukhune District Municipality seeks bids for a three-year panel contract for electro-mechanical services. The contract involves supply, installation, repair, and maintenance of water infrastructure, including boreholes, pump stations, and treatment plants. Tasks include electrical work like cable laying, transformer maintenance, and solar system installation, as well as mechanical repairs for generators and engines. The project is within Sekhukhune District, requiring readiness for emergency call-outs and comprehensive maintenance of water services infrastructure. The contract may be extended beyond three years.

corner chris wiid and van riebeeck streets, groblersdal-GROBLERSDAL-GROBLERSDAL-0470R 15 000 000
Electrical & Plumbing30 Nov 2026

Appointment of contractors for smart meter installations.

Eskom seeks 100 panel contractors for installing, commissioning, and maintaining smart metering infrastructure in the LimLanga cluster. The project includes smart meters, data concentrators, ready board retrofits, and pole-top kiosks, along with decommissioning and disposing of old equipment. The contract is for 2 years on an 'as and when required' basis, requiring data capture management and compliance with Eskom's standards. Closing date: 30 November 2026.

Limpopo Operating Unit-Polokwane central-Polokwane-0699R 150 000 000