Design and build temporary ablution facilities at George Airport.
Airports Company South Africa
In plain English
Construction and renovation of ablution facilities at George Airport. No specific eligibility criteria stated.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites tenders for the design and construction of temporary ablution facilities and the repair of existing ones at George Airport. The project, located at Ptn 78 of Farm 208, involves four work packages: installing prefabricated containerised units at the arrivals and departure concourses, and refurbishing existing facilities on the ground and first floors. Key tasks include demolition, plumbing, electrical installations, drywall partitioning, and high-quality finishes. The contract duration is 17 months. Bidders must attend a compulsory site inspection on 30 October 2026 at 11:00 at the George Airport Terminal Building. The project requires strict adherence to NBR and SANS 10400 standards. All work must be completed within 14 months of contract signing, with a 12-month defects liability period. Bidders must provide a construction manager with relevant building or civil engineering qualifications.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 3 General Building (3GB)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- CIDB grading of 3 GB or higher
- Valid SARS Tax Compliance Status PIN
- Valid COIDA Letter of Good Standing
- Proof of CSD registration
- SACAP-registered architectural professional
- AAAMSA certification for aluminium work
Contact & how to apply
Name: Makhaya Mlenze
Email: Makhaya.Mlenze@airports.co.za
Phone: 010-207-2000
How to apply: Submit applications via email to AcsaRfq@airports.co.za. Break submissions into at least four attachments of 4MB each. Include one original, one copy, and an electronic copy on a USB flash drive. Ensure all pages are signed or stamped.
Related tenders
Building Refurbishment at Chief Dawid Stuurman Airport.
This tender involves the refurbishment of the Maintenance and Engineering building at Chief Dawid Stuurman International Airport in Gqeberha. Issued by ACSA, the project includes structural repairs, roofing, electrical upgrades, architectural finishes, and converting a garage into a boardroom. The contract spans 18 months, requiring fixed pricing and adherence to quality and safety standards. Bidders must demonstrate technical competence and provide a qualified project team. The project is managed under the NEC3 Engineering and Construction Contract framework.
General Building Maintenance at O.R. Tambo Airport
Airports Company South Africa (ACSA) invites tenders for general building maintenance at O.R. Tambo International Airport. This 4-month contract covers services such as tiling, painting, carpentry, welding, and waterproofing across various airport facilities. The work is performed on a call-out basis, requiring a 24/7 standby team and specific response times for repairs. Key deliverables include regular condition assessments, detailed service reports, and adherence to OEM standards. The contractor must provide all necessary tools and equipment. All repair work is subject to a 3-month defect-free guarantee. The project requires a dedicated site manager and qualified tradespeople to ensure operational reliability at the airport.
Consultant for Airside Road Design at Gqeberha Airport.
The Airports Company South Africa (ACSA) seeks a consultant for engineering design and construction monitoring services for refurbishing airside service roads at Chief Dawid Stuurman International Airport. The project involves 10.5km to 15km of roadwork, including paving, drainage, and vegetation control, over 24 months. Responsibilities include technical reports, detailed designs, Bills of Quantities, and construction supervision. The consultant will also train two ACSA trainee engineers. A compulsory briefing session is on 28 October 2026. The contract uses the NEC3 Professional Services model, requiring security vetting for personnel.
AWOS Design, Installation, and Maintenance at Airports
Airports Company South Africa (ACSA) seeks tenders for designing, supplying, installing, and commissioning new Automated Weather Observation Systems (AWOS) at Cape Town, Chief David Stuurman, George, Upington, and Kimberley airports. The project includes decommissioning existing systems and a 60-month maintenance contract for George, Upington, and Kimberley. Deliverables include meteorological sensors, redundant servers, fibre optic networks, and operator training. The contract follows NEC3 ECC3 and TSC frameworks, with a 24-month installation period and a 60-month maintenance period. Bidders must have experience in aviation navigational aids and meet technical standards in compliance with ICAO, WMO, and SANS.
Design & Build Modular Guard Houses at Airports
Airports Company South Africa (ACSA) seeks a contractor for the design, construction, and installation of 18 modular guardhouses at King Shaka International Airport, Chief Dawid Stuurman International Airport, and King Phalo Airport. The project includes managing the full design process, covering architectural, civil, electrical, and mechanical services, with deliverables such as health and safety plans, design drawings, and commissioning of guardhouses with ICT and security systems. The contract spans 18 months, with construction within 4 to 6 months post site access, following the NEC3 ECC Option B contract model. Work is to be done after operational hours. A compulsory briefing session is on 12 October 2026, with proposal submissions due by 12:00 PM on 10 November 2026 at King Shaka International Airport.
ECC Room Renovations at Chief Dawid Stuurman Airport
The Airports Company South Africa (ACSA) invites tenders for renovating the ECC Room at Chief Dawid Stuurman International Airport. The project involves construction work on the airport's landside area. A compulsory site inspection is scheduled for 18 November 2026 at the airport's information desk. The deadline for bid submissions is 27 November 2026 at 13:00. The contract requires fixed pricing with no price adjustments. Bidders must meet all technical and insurance requirements, including specific construction plant and liability insurance policies, adhering to ACSA's insurance framework for landside construction.