VVUZA

Letlhogoring Water Supply Project Tender

Bridget Mokate

Compulsory briefing — you must attend to bid

9 November 2026 at 10:00 · Opposite Mokaila Intermediate School, coordinates: S26° 01' 06", E25° 34' 45"

In plain English

The tender is for a project managed by Ngaka Modiri Molema District Municipality. Bidders must attend a compulsory site inspection.

Always check the official document
Closing date
30 November 2026
Location
Cnr. Carrignton & First Avenuw-Mahikeng, Industral Site-Mahikeng-2745
Estimated value
R 5 000 000
Published
30 October 2026
Tender no.
NMMDM-26-27-01-PMU

Description

The Ngaka Modiri Molema District Municipality has issued tender NMMDM 26/27/01 PMU. The work will take place at the municipality offices located at the corner of Carrington and 1st Avenue, Mahikeng Industrial Site. While specific project details are contained within the formal tender documents, the process requires a mandatory site inspection to be held on 09 November 2026 at 10:00am, meeting opposite the Mokaila Intermediate School. Interested parties must obtain the official tender documents from the municipality upon payment of a non-refundable fee of R3,661.00. The closing date for all submissions is 30 November 2026 at 11:00am.

What you need to qualify

  • Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.

Full requirements

  • Must attend compulsory site inspection
  • Must hold valid Tax Clearance Certificate
  • Must comply with National Industrial Participation Programme

Contact & how to apply

Name: Bridget Mokate

Email: mokateb@nmmdm.gov.za

Phone: 018-381-9450

How to apply: Tenders must be physically delivered in a sealed envelope, clearly marked with the tender number and closing date, to the tender box at the Ngaka Modiri Molema District Municipality offices at Cnr. Carrington & 1st Avenue, Mafikeng Industrial Site. Electronic or telegraphic submissions are not accepted.

Download tender documents

Related tenders

Construction & Engineering19 Nov 2026

Construction of Western Highveld Bulk Water Supply Scheme

The Nkangala District Municipality invites tenders for the construction of the Western Highveld Bulk Water Supply Scheme, Work Package 1. This project includes developing bulk water infrastructure such as a raw water pump station at Rust De Winter Dam, a 20km rising main pipeline, an 11 ML/day Water Treatment Works, an 11.5 ML Command Reservoir, and staff accommodation. It involves installing mechanical and electrical systems, telemetry/SCADA integration, and commissioning the system. Located in Nkangala and Dr JS Moroka Local Municipalities, the project spans 36 months with a 120-day tender validity period, requiring strict adherence to quality, safety, and environmental standards.

Nkangala Distict Municipality 2A Walter Sisulu Street-Middelburg-Mpumalanga-1050R 50 000 000
Construction & Engineering19 Nov 2026

Construction of Western Highveld Bulk Water Supply Scheme.

The Nkangala District Municipality invites tenders for the construction of the Western Highveld Bulk Water Supply Scheme, Work Package 2. The project involves developing bulk water infrastructure, including pipelines, water treatment works, pump stations, and concrete reservoirs to improve water security in the Dr JS Moroka Local Municipality area. Key deliverables include mechanical and electrical systems installation, borehole equipping, and as-built documentation. The project duration is 36 months, requiring bidders to demonstrate experience in similar large-scale projects and provide a detailed construction programme. The tender follows the 90/10 preference point system with fixed rates for the contract duration.

2A Walter Sisulu Street Nkangala District Municipality-Middelburg-Mpumalanga-1050R 50 000 000
Electrical & Plumbing02 Nov 20263d left

Construction of Loskop Bulk Water Supply Scheme - Work Package 6B.

The Nkangala District Municipality invites tenders for the construction of the Loskop Regional Bulk Water Supply Scheme, specifically Work Package 6C, involving Eskom MV Bulk Electrical Connection for the Hare and Mink line sections to Pump Stations 3 and 4 in Thembisile Hani Local Municipality, Mpumalanga. Key deliverables include installation of MV electrical infrastructure, pole planting, conductor stringing, and equipment commissioning. The project must be completed within 180 calendar days. A non-compulsory clarification meeting is scheduled for 22 October 2026 at 10h00 at the Nkangala District Municipality offices in Middelburg. The tender is valid for 120 days from the closing date of 02 November 2026.

2A Walter Sisulu-Aerorand-Middelburg-1050R 50 000 000
Construction & Engineering03 Nov 20264d left

Borehole Management and Construction Project

The Maquassi Hills Local Municipality invites tenders for managing underground resources, designing, and monitoring the construction of boreholes. The project involves inspecting, cleaning, re-testing existing boreholes, and installing solar-powered pumping systems, pump houses, security fencing, and water storage tanks. It includes water treatment upgrades to meet SANS 241:2015 standards, with work in Wolmaransstad Ext. 17-19, Lebaleng, and Kgakala. Part of the Municipal Infrastructure Grant and Expanded Public Works Programme, the project spans six months. The tender closes on 3 November 2026 at 12h00.

19 Kruger Street-Wolmaransstad-wolmaransstad-2630R 50 000 000
Electrical & Plumbing05 Nov 20266d left

Supply and installation of smart bulk water meters.

The Maluti-a-Phofung Local Municipality seeks bids for the supply, delivery, and installation of smart bulk water meters to enhance water management infrastructure. A compulsory briefing session is scheduled for 02 October 2026 at Tshiame B (Sediba Hall). Proposals are due by 05 November 2026, evaluated under the 90/10 preferential points system.

MOTLUNG AND MOREMOHOLO-PHUTHADITJHABA-PHUTHADITJHABA-9870R 15 000 000
Construction & Engineering13 Nov 2026

Thalane Water Supply Phase 1 Project

The Capricorn District Municipality invites tenders for the Thalane Water Supply Phase 1 project in Senwabarwana. This project involves equipping boreholes, constructing pump houses, erecting steel storage tanks, installing water reticulation piping, constructing communal standpipes, and installing security fencing. It requires connecting to the Eskom power grid and aims to create work opportunities. The contract duration is 10 months, and a compulsory meeting is on 26 October 2026. The closing date for submissions is 13 November 2026.

Thalane Village situated within Blouberg Local Municipality-Bochum-Polokwane-0700R 45 000 000