Construction of Bulk Water Supply in Reagile Ext 8
OTSILE MADISA
Compulsory briefing — you must attend to bid
6 November 2026 at 11:00 · Koster Town Hall (Municipal Buildings)
In plain English
The Kgetlengrivier Local Municipality is procuring a professional contractor for the construction of bulk water supply in Reagile Ext 8. Eligible bidders must have a CIDB grading of 5CEPE for potentially emerging enterprises or 6CE or higher.
Always check the official documentDescription
The Kgetlengrivier Local Municipality invites bids for the construction of a bulk water supply system in Reagile Extension 8. The project involves site establishment, excavation, and the installation of over 4,600 meters of uPVC piping to connect the Koster Water Treatment Works to the extension. Key deliverables include the successful installation of 200mm and 160mm diameter pipes. The work is located in Koster. Bidders must attend a compulsory briefing session on 6 November 2026. The project requires adherence to local labour content targets and specific technical qualifications for project management staff. The tender closes on 27 November 2026.
What you need to qualify
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 6 Civil Engineering (6CE)) — A Construction Industry Development Board grade in the right class of works.
Full requirements
- Valid Tax Clearance Certificate or SARS PIN
- Valid CIDB grading of 5CEPE or 6CE+
- Audited annual financial statements for the past three years
Contact & how to apply
Name: OTSILE MADISA
Email: otsile.madisa@gmail.com
Phone: 073-223-2906
How to apply: Submit sealed bids in the tender box at the foyer of the Kgetlengrivier Local Municipality, corner Smuts and De Wet Street, Koster, by 27 November 2026 at 12:00. Late, emailed, or faxed submissions will not be accepted.
Related tenders
Bulk Water Supply Project in Swartruggens
The Kgetlengrivier Local Municipality invites tenders for constructing a rising main from the Swartruggens Water Treatment Plant to the Bo-Dorp reservoir. The project includes building a pump station, installing pumps with variable-speed drives, setting up a standby generator, and integrating telemetry and SCADA systems. It also involves a trenchless river crossing, reservoir refurbishment, and establishing a District Metered Area. The contractor must test, commission, and train municipal staff, adhering to specified technical standards. The tender closes on 19 November 2026.
Professional Contractor for Water Management Project
The Kgetlengrivier Local Municipality seeks bids for a Water Conservation and Demand Management Project. The project involves installing telemetry, SCADA, and automation systems in various locations, including Koster and Swartruggens. Key tasks include setting up radio communication networks, installing sensors, monitoring pumps, and establishing a Telemetry Operations Centre. The project requires local labour and Labour-Intensive Construction methods. Bidders must have experience in similar projects and adhere to a fixed-rate pricing structure.
Construction of Western Highveld Bulk Water Supply Scheme.
The Nkangala District Municipality invites tenders for the construction of the Western Highveld Bulk Water Supply Scheme, Work Package 2. The project involves developing bulk water infrastructure, including pipelines, water treatment works, pump stations, and concrete reservoirs to improve water security in the Dr JS Moroka Local Municipality area. Key deliverables include mechanical and electrical systems installation, borehole equipping, and as-built documentation. The project duration is 36 months, requiring bidders to demonstrate experience in similar large-scale projects and provide a detailed construction programme. The tender follows the 90/10 preference point system with fixed rates for the contract duration.
Construction of Western Highveld Bulk Water Supply Scheme
The Nkangala District Municipality invites tenders for the construction of the Western Highveld Bulk Water Supply Scheme, Work Package 1. This project includes developing bulk water infrastructure such as a raw water pump station at Rust De Winter Dam, a 20km rising main pipeline, an 11 ML/day Water Treatment Works, an 11.5 ML Command Reservoir, and staff accommodation. It involves installing mechanical and electrical systems, telemetry/SCADA integration, and commissioning the system. Located in Nkangala and Dr JS Moroka Local Municipalities, the project spans 36 months with a 120-day tender validity period, requiring strict adherence to quality, safety, and environmental standards.
Vulindlela Rural Bulk Water Supply Scheme Phase 2 Construction
uMngeni-uThukela Water invites tenders for constructing the Vulindlela Rural Bulk Water Supply Scheme, Phase 2, in Howick West. The project includes building a pump station connected to Reservoir 2, constructing reinforced concrete structures, installing pipelines, and commissioning the pump station. A compulsory clarification meeting is on 06 October 2026, and the tender closes on 05 November 2026.
Engineering Services for Landfill Closure and Rehabilitation.
The Kgetlengrivier Local Municipality seeks a service provider for engineering technical design, closure, and rehabilitation of the Koster and Swartruggens landfill sites. The project includes site investigations and designs for final capping, storm water diversion, and leachate and gas management to comply with waste management license conditions and obtain approval from the Department of Water and Sanitation. Expertise in environmental auditing and landfill rehabilitation is required. The closing date is 23 October 2026.