VVUZA

Supply and delivery of small diameter valves.

Johannesburg Water

Compulsory briefing — you must attend to bid

14 July 2026 at 13:00 · 2 James street, Ennerdale, Johannesburg, Ennerdale Depot

In plain English

Johannesburg Water is procuring the Greater Orange Farm Phase 3D Water Infrastructure Upgrade and Renewal Project. Bidders must have a CIDB grading of 8CE or higher.

Always check the official document
Closing date
5 August 2026
Location
NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-Johannesburg-JOHANNESBURG-2001
Estimated value
R 45 000 000
Published
29 June 2026
Tender no.
JW-OPS-026-25

Description

Johannesburg Water has issued four tenders for infrastructure and maintenance services. Projects include the Greater Orange Farm water upgrade (JW14427D) and the Inchanga sewer rising main upgrade (JW14513). Additionally, there are tenders for the supply of small diameter valves (JW OPS 026/25) and the installation and servicing of firefighting equipment (JW OPS 034/25). These supply contracts cover a 36-month period. Work will take place at various locations in Johannesburg, including Ennerdale and Zandspruit. All projects require attendance at compulsory briefing sessions held in July 2026, with final submissions due in early August 2026.

What you need to qualify

  • CIDB grading (Grade 8 Civil Engineering (8CE))A Construction Industry Development Board grade in the right class of works.

Full requirements

  • Must hold CIDB grading of 8CE or higher for JW14427D and JW14513

Contact & how to apply

Name: Lenah Motaung

Email: lenah.motaung@jwater.co.za

Phone: 011-688-1945

How to apply: Submit physical, neatly bound documents in sealed envelopes marked with the tender number and closing date. Deposit them into the tender box at the entrance to Turbine Hall, 65 Ntemi Piliso Street, Newtown, for the attention of the Supply Chain Management Unit.

Download tender documents

Related tenders

Construction & Engineering22 Jul 2026

Supply and Service of Pressure Management Equipment

Johannesburg Water (SOC) Ltd seeks tenders for the supply, delivery, installation, servicing, and onsite training of advanced pressure management equipment and monitoring systems on an as-needed basis for 36 months. Projects include water infrastructure upgrades and pipeline replacements in Johannesburg, with closing dates from 22 July 2026 to 30 July 2026.

NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-Johannesburg-JOHANNESBURG-2001R 45 000 000
General Purpose24 Jul 2026

Supply and Delivery of Consumables for 36 Months.

Johannesburg Water (SOC) Ltd invites tenders for the supply, delivery, and offloading of consumables on an as-needed basis for a period of thirty-six months. This is part of a broader initiative including water infrastructure upgrades and pipeline replacements within Johannesburg.

NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-Johannesburg-JOHANNESBURG-2001R 45 000 000
Construction & Engineering03 Aug 2026

Supply and Maintenance of Firefighting Equipment.

Johannesburg Water seeks service providers for the supply, delivery, installation, and servicing of firefighting equipment on an as-needed basis for 36 months. This tender is part of four projects, including water infrastructure upgrades and sewer main upgrades. Attendance at compulsory briefing sessions in Johannesburg is required, and bids must be submitted to Turbine Hall in Newtown by August 2026.

NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-Johannesburg-JOHANNESBURG-2001R 50 000 000
Construction & Engineering28 Jul 2026

Water and Sewer Pipeline Replacement in Inner City.

Johannesburg Water invites tenders for the replacement of water and sewer pipelines in the Johannesburg inner city. The project requires specific CIDB contractor gradings and involves attending compulsory briefing sessions. The contract is part of a broader infrastructure upgrade across Johannesburg.

NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-Johannesburg-JOHANNESBURG-2001R 65 000 000
Construction & Engineering10 Jul 2026

Replacement of Dewatering Belt Press at Northern Wastewater Treatment.

Johannesburg Water invites tenders for replacing the Dewatering Belt Press Building and related equipment at the Northern Wastewater Treatment Works. Compulsory briefing on 18 June 2026, with a closing date of 10 July 2026.

NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-NEWTOWN-JOHANNESBURG-2001R 25 000 000
Construction & Engineering10 Aug 2026

Greater Orange Farm Phase 3D Water Infrastructure Upgrade.

Johannesburg Water seeks service providers for the Greater Orange Farm Phase 3D water infrastructure upgrade, along with other projects including the Inchanga sewer rising main upgrade, supply of small diameter valves, and installation and servicing of firefighting equipment. Projects are located across Johannesburg, with contracts for valves and firefighting equipment lasting thirty-six months. Compulsory briefing sessions are required before closing dates in August 2026.

NO 65 NTEMI PILISO STREET, TURBINE HALL, NEWTOWN-Johannesburg-JOHANNESBURG-2001R 25 000 000