Emangwaneni Electrification Project in Ward 3
THABANI KHUMALO
In plain English
The tender is for the appointment of a contractor for electrification of 140 connections in Ward 3, Phase 1. Eligibility requirements are not specified in the text.
Always check the official documentDescription
The Okhahlamba Local Municipality is seeking a contractor for the electrification of 140 infill connections in Ward 3, Phase 1 of the Emangwaneni area. The project requires the successful bidder to complete all electrical works within a period of four months. Following completion, there is a 12-month defects liability period. The contract includes provisions for a 10% retention fee and allows for an 80% advance payment on materials stored on-site that have not yet been installed. This project aims to improve local infrastructure by expanding electrical access to residents in the specified ward.
Full requirements
- Must maintain valid Occupational Health and Safety (OHS) compliance
- Must provide acceptable financial guarantees or insurance bonds
Contact & how to apply
Related tenders
Electrification Project in eMangwaneni, Ward 3
The Okhahlamba Local Municipality seeks a contractor for electrifying 140 households in eMangwaneni, Ward 3. The project includes installing medium voltage infrastructure, such as transformers, overhead lines, and smart meters. The contractor will handle testing, commissioning, and uploading connection data to the Eskom system, adhering to Eskom standards and safety regulations. Completion is expected within four months, with key deliverables including electrical lines, household connections, and as-built drawings. All materials must be new and sourced from Eskom-approved suppliers.
Construction of Luthilunye Phase 3 Electrification Project.
The Emadlangeni Municipality invites bids for the Luthilunye Phase 3 Electrification Project in Ward 01, involving electrical connections for 114 households. The contractor must handle the specified electrification infrastructure, adhering to municipal requirements. Submissions are due by 12h00 on 13 November 2026.
Construction of Balgray Electrification Project for 41 Households.
The Emadlangeni Local Municipality invites tenders for construction work classified as 3EP in Utrecht. The project involves specialized electrical infrastructure services. Submissions must be finalized by 13 November 2026 at 12h00. Contractors must demonstrate technical capacity and valid registration.
Maintenance of high voltage outdoor equipment.
The eThekwini Municipality invites tenders for the maintenance and repair of high voltage outdoor equipment ranging from 33 kV to 275 kV on an as-required basis for 36 months. Work includes preventative and corrective maintenance, emergency repairs, and equipment replacement at municipal substations. The contractor must provide necessary labour, tools, and transport, and maintain a local office within eThekwini. A qualified team is required, adhering to safety standards and providing detailed reports.
Panel for Electrical Network Maintenance and Upgrading.
The Emalahleni Local Municipality in the Eastern Cape seeks a panel of three service providers for electrical network maintenance and upgrades over 36 months on an as-and-when-required basis. The work involves supporting electrical infrastructure to ensure the network remains functional and updated. Tender number ELM/4/10/2026T must be submitted by 12:00 on November 23, 2026.
Panel Contract for Electro-Mechanical Services.
Sekhukhune District Municipality seeks bids for a three-year panel contract for electro-mechanical services. The contract involves supply, installation, repair, and maintenance of water infrastructure, including boreholes, pump stations, and treatment plants. Tasks include electrical work like cable laying, transformer maintenance, and solar system installation, as well as mechanical repairs for generators and engines. The project is within Sekhukhune District, requiring readiness for emergency call-outs and comprehensive maintenance of water services infrastructure. The contract may be extended beyond three years.