VVUZA

Installation of Delineation Kerbing at King Shaka Airport

Airports Company South Africa

Compulsory briefing — you must attend to bid

18 June 2026 at 13:00 · MSO Building, Reception, Ground Floor

In plain English

The Airports Company South Africa is procuring the installation of delineation kerbing at King Shaka International Airport. Bidders must have a CIDB contractor grading of 2 CE or higher.

Always check the official document
Closing date
30 June 2026
Location
King Shaka International Airport-La Mercy-Durban-4000
Estimated value
R 600 000
Published
12 June 2026
Tender no.
RFQ28501

Description

The Airports Company South Africa (ACSA) invites contractors to bid for the installation of delineation kerbing at King Shaka International Airport. This project involves professional construction services to improve site infrastructure. The work must be performed directly at the airport premises. All pricing provided by the bidder must remain fixed and binding for the duration of the contract, as no price adjustments are permitted. The project requires specific technical expertise in road construction and kerbing. Interested parties must attend a compulsory site meeting to understand the project scope. The final deadline for all bid submissions is 30 June 2026.

What you need to qualify

  • CSD registrationRegistration on the Central Supplier Database — required to do business with government.
  • Tax clearanceA valid SARS tax compliance status (PIN) showing your tax affairs are in order.
  • B-BBEE certificateA B-BBEE certificate or sworn affidavit confirming your contribution level.
  • CIDB grading (Grade 2 Civil Engineering (2CE))A Construction Industry Development Board grade in the right class of works.
  • Letter of Good StandingCOID registration and a Letter of Good Standing from the Compensation Fund.

Full requirements

  • Valid CIDB contractor grading of 2 CE or higher
  • Valid COIDA or FEMA Letter of Good Standing
  • Valid SARS Tax Compliance Status PIN
  • Proof of registration on the Central Supplier Database (CSD)
  • Valid B-BBEE certificate or sworn affidavit

Contact & how to apply

Name: Mlungisi Professor Mgobhozi

Email: Mlungisi.mgobhozi@airports.co.za

Phone: 032-436-6198

How to apply: Submit your bid via email to acsarfq@airports.co.za. You must provide one original document, one hard copy, and an electronic version on a USB flash drive. Ensure all documents are submitted before the closing date and time.

Download tender documents

Related tenders

Construction & Engineering24 Jun 2026

Supply and Install Vehicle Restrictors at King Shaka Airport

The Airports Company South Africa (ACSA) seeks bids for the supply, delivery, and installation of over-height vehicle restrictors on the Alpha Service Road at King Shaka International Airport. The project includes removing existing height restriction bars, replacing them with hanging chain links and corrosion-protected steel spheres, repainting gantries, and installing new signage. Completion is required within two months, with on-site work taking five days. The contract uses the NEC3 ECSC3 model, with fixed rates and prices. The tender follows the 80/20 preference point system and closes on 24 June 2026 at 16:00 PM.

King Shaka International Airport-La Mercy-Durban-4000R 500 000
Construction & Engineering30 Jun 2026

Guard rail repairs and FOD equipment supply at airports.

This tender by Airports Company South Africa involves the once-off repair of guard rails at King Shaka International Airport and the supply of Foreign Object Debris (FOD) sweeping equipment to King Shaka, King Phalo, and Chief Dawid Stuurman International Airports. The contractor must provide OEM-approved technical support for three years, with work managed through task orders over a six-month contract. Key deliverables include motorised and tow-behind sweepers. A compulsory site meeting is on 18 June 2026, and pricing must remain fixed for the contract duration. The project is located in KwaZulu-Natal and other specified airport locations.

King Shaka International Airport-La Mercy-Durban-4000R 1 500 000
General Purpose03 Jul 2026

Operation and Maintenance of Baggage Handling System.

The Airports Company South Africa (ACSA) seeks tenders for the operation and maintenance of the Baggage Handling System at King Shaka International Airport for 5 months. Responsibilities include managing conveyor systems, sorters, carousels, and controls, with preventive and corrective maintenance, daily monitoring, and reporting. A skilled team is required to ensure 99.5% system availability, manage spares, and adhere to safety protocols. Bidders must attend a site inspection and demonstrate technical competence. The contract is fixed-price with performance measured against KPIs.

King Shaka International Airport-La Mercy-Durban-4000R 3 500 000
Construction & Engineering19 Jun 20267d left

Repair of Concrete Edges at King Phalo Airport

Airports Company South Africa seeks a service provider to repair broken and cracked concrete edges on the main apron blocks at King Phalo Airport for up to six months, starting upon contract signing.

King Phalo International Airport-East London-East London-5201R 5 000 000
Technology17 Jun 20264d left

Billing Software Services at King Shaka International Airport.

Airports Company South Africa seeks tenders for billing software services, including uninstalling and configuring current software, implementing a server, updating SCADA system, supplying an optical eye for tenant queries, tariff optimization, and configuring ACSA BMS. Duration: six months. Closing date: June 10, 2026.

King Shaka International Airport--Durban-R 48 900 000
Cleaning & Maintenance25 Jun 2026

Maintenance of Sliding Doors at King Shaka Airport.

Airports Company South Africa seeks a contractor for a 36-month maintenance and repair service of sliding and roller doors at King Shaka International Airport. The contractor will perform preventive and corrective maintenance, adhering to OEM standards, SANS regulations, and the Occupational Health and Safety Act. A skilled team, including Millwrights and Technical Assistants, is required to meet performance indicators such as a 6-hour emergency response time. The contractor must partner with a Level 1 B-BBEE Targeted Enterprise for at least 30% of the contract value. Pricing is fixed for the contract duration, evaluated on an 80/20 preference point system, with a minimum functionality score of 70 points needed for consideration.

King Shaka International Airport-La Mercy-Durban-4000R 3 500 000