VVUZA

Maintenance and Repair of Garden Waste Depot.

Saldanha Bay Municipality

Compulsory briefing — you must attend to bid

29 July 2026 at 11:15 · Garden waste Depo, Vredenburg SportGround, Vredenburg, 7380

In plain English

Maintenance and repair of garden waste depot for Saldanha Bay Municipality. Bidders must be registered on the Central Supplier Database (CSD) and comply with B-BBEE requirements.

Always check the official document
Closing date
5 August 2026
Location
Saldanha Bay Municipality
Estimated value
R 300 000
Published
Not listed
Tender no.
Q095-2027

Description

The Saldanha Bay Municipality is inviting bids for the maintenance and repair of the Garden Waste Depo located in Vredenburg. The project includes painting internal and external walls, doors, and fascia boards, as well as applying epoxy floor coatings and high-pressure cleaning of surfaces. The contractor is responsible for site establishment, waste removal to approved facilities, and ensuring all work meets specific quality standards. The project must be completed within four working weeks from the date of the official order. A compulsory site meeting will be held on 29 July 2026 at the Vredenburg SportGround. All work must be finished by 05 August 2026.

What you need to qualify

  • CSD registrationRegistration on the Central Supplier Database — required to do business with government.
  • Registered companyAn active CIPC-registered company in good standing.
  • Tax clearanceA valid SARS tax compliance status (PIN) showing your tax affairs are in order.
  • B-BBEE certificateA B-BBEE certificate or sworn affidavit confirming your contribution level.
  • CIDB grading (Grade 1 General Building (1GB))A Construction Industry Development Board grade in the right class of works.
  • Letter of Good StandingCOID registration and a Letter of Good Standing from the Compensation Fund.

Full requirements

  • Registered on the Central Supplier Database (CSD)
  • Minimum CIDB grading of 1GB
  • Valid Letter of Good Standing (WCA)
  • Completed two similar projects within the last three years
  • Valid Tax Compliance status
  • Valid B-BBEE certificate or sworn affidavit
  • CIPC company registration documents

Contact & how to apply

Name: R COETZEE

Phone: 022 701 7167

How to apply: Sealed quotations must be hand-delivered to the quotation box located at the Investment Centre, Ground Floor, Saldanha Bay Municipality, 15 Main Road, Vredenburg, 7380.

Download tender documents

Related tenders

Construction & Engineering05 Aug 2026

Maintenance and Repair of Garden Waste Depot for Saldanha Bay Municipality.

The Saldanha Bay Municipality invites tenders for the maintenance and repair of the Garden Waste Depot in Vredenburg. The project involves tiling, ceiling installations, and the replacement of sanitary ware, including toilets, basins, and showers. The contractor is responsible for site preparation, painting, and the removal of all waste to an approved facility. Work must be completed within four weeks of receiving an official order, with site access beginning within seven days. A compulsory clarification meeting will be held on 29 July 2026. The project must be finished by 05 August 2026.

Saldanha Bay MunicipalityR 300 000
Cleaning & Maintenance29 Jul 20261d left

Refurbishment and Maintenance of Garden Waste Depot, Ward 8.

The Saldanha Bay Municipality invites bids for refurbishing and maintaining the Garden Waste Depot in Ward 8, Vredenburg. The project involves site establishment, carpentry, installation of suspended ceilings, stainless steel sinks, and rainwater systems. The contractor must remove all site waste to a registered facility, with completion required within four weeks of receiving an official order. A compulsory clarification meeting is scheduled for 23 July 2026 at the Vredenburg Garden Waste Depot. Bidders must submit a detailed Health and Safety file for approval before commencing work.

Saldanha Bay MunicipalityR 300 000
Construction & Engineering29 Jul 20261d left

Maintenance and Repair of Vredenburg Workshop.

The Saldanha Bay Municipality invites bids for the maintenance and repair of the Building Department workshop in Vredenburg. The project includes installing ceiling insulation, Iso-board ceilings, and foam cornices, along with surface preparation and painting. Completion is required within 14 days of the official order. Bidders must have completed at least three similar projects in the last three years with contactable references. The work will occur at the Building Department in Floryn Street, Marias Industrial, Vredenburg. The tender is awarded as a whole, with firm pricing.

Saldanha Bay MunicipalityR 300 000
Construction & Engineering22 Jul 2027

Repair and Maintenance of Fence at Vredenburg Landfill Site.

The Saldanha Bay Municipality invites bids for the repair and maintenance of fencing at the Vredenburg Landfill Site. The project includes the supply and installation of Clearview or Smart fencing, site preparation, excavation, and removal of vegetation. Materials must be high-quality, hot-dipped galvanized steel. Completion is required within two weeks of order receipt, with deliveries to the Municipality Stores in Vredenburg. A health and safety file must be submitted for approval within one week of the order date.

Saldanha Bay MunicipalityR 300 000
Cleaning & Maintenance05 Aug 2026

Maintenance and Repair of Witteklip Community Hall.

The Saldanha Bay Municipality seeks a contractor for maintenance and repair of the Witteklip Community Hall in Vredenburg. The project includes painting walls, replacing ceilings and fascia boards, installing gutters, retiling, and roof maintenance. The contractor must provide all materials and dispose of waste properly. Completion is required within 14 days of order. A compulsory site meeting is on 29 July 2026.

Saldanha Bay MunicipalityR 300 000
Construction & Engineering05 Aug 2026

Maintenance and Repair of Skilpad Community Hall.

This tender is for the maintenance and repair of the Skilpad Community Hall in Vredenburg, issued by the Saldanha Bay Municipality. The project includes painting, tiling, floor varnishing, waterproofing, and servicing aluminium stacker doors. The work must be completed within four working weeks of receiving an official order. All materials and workmanship must carry a minimum two-year guarantee, and all construction must follow SABS Codes of Practice. The contractor is responsible for waste removal to a registered facility. A compulsory site clarification meeting is required for all bidders.

Saldanha Bay MunicipalityR 300 000