Maintenance of Fire Safety Systems at Cape Town Airport
Airports Company South Africa
In plain English
Maintenance of fire sprinkler, hose reels, and hydrant system for 24 months at Cape Town International Airport. Bidders must have a CIDB contractor grading of 4SF or higher.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites tenders for the maintenance, annual service, and inspection of fire sprinkler systems, hose reels, and hydrants at Cape Town International Airport. This contract will run for a duration of 24 months. The scope of work includes servicing booster water pumps and associated fire protection components in accordance with SANS standards and OEM requirements. Work may occur during night hours to minimize operational interference. The project involves both preventative maintenance and ad hoc repairs. Bidders must provide a comprehensive resource plan and ensure all key personnel, including the site supervisor, technicians, and assistants, meet specific registration and experience criteria. The tender is evaluated based on the 80/20 preference point system.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 4 Specialist Works (4SW)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Valid CIDB grading of 4SF or higher
- Valid SABS SANS1475 certification
- Valid SARS Tax Compliance Status
- Registered on the Central Supplier Database (CSD)
- Valid COIDA Letter of Good Standing
- Valid Public and Aviation Liability Insurance
- Technical staff must hold SAQCC Fire registration
- Valid Occupational Health and Safety (OHS) certificate
- Audited proof of company solvency
- Documented proof of relevant project experience
Contact & how to apply
Name: Sandra Sebokolodi
Email: tenders.scm11@airports.co.za
Phone: 011-723-2636
How to apply: Submit the completed bid documents and contract via email to Acsarfq@airports.co.za. Ensure the submission includes one original and one copy in sealed, clearly marked envelopes. All queries must be directed to the Service Manager, Khathulo Rabambi, or the contact person listed in the tender documents.
Related tenders
Fire System Remedial Works at Cape Town Airport.
Airports Company South Africa (ACSA) seeks a service provider for executing and supervising fire system remedial works at Cape Town International Airport. The project ensures compliance with SANS 10400 standards, involving architectural surveys, fire rational design, flow test installations, and smoke extraction systems. The 12-month contract under NEC3 Option B includes commissioning, hydraulic testing, and system flushing. Qualified personnel, including architects, engineers, and SAQCC-certified supervisors, are required. A 52-week defects liability period is included, with adherence to ACSA's environmental and safety standards.
Maintenance of Power Network at Cape Town Airport
Airports Company South Africa seeks bids for the preventative and corrective maintenance of the Medium and Low Voltage power reticulation network at Cape Town International Airport for twelve months. Tasks include inspections, testing, condition monitoring, and emergency repairs on switchgear, transformers, and SCADA systems. A dedicated on-site team is required, and work must comply with SANS 10142 and aviation safety standards. Deliverables include maintenance reporting, spare parts management, and Certificates of Compliance. The project follows an NEC 3 Term Service Contract, with the contractor responsible for obtaining necessary airside permits.
Maintenance of Boarding Bridges at Cape Town Airport
The Airports Company South Africa (ACSA) invites tenders for a 5-year contract for maintenance, repairs, and minor refurbishment of Passenger Boarding Bridges and Aircraft Docking Systems at Cape Town International Airport. The scope includes preventative and corrective maintenance, 24-hour standby services, and spare parts management. Compliance with international aviation standards and safety protocols is required. The project mandates partnering with a Targeted Enterprise for at least 30% of the contract value and is structured as an NEC3 Term Service Contract with fixed pricing.
Electrical Contractor for Assessment and Certification at ACSA.
The Airports Company South Africa (ACSA) seeks an electrical contractor for the assessment, verification, and certification of Low Voltage electrical installations at Cape Town International Airport. The contractor will conduct audits, issue Certificates of Compliance, and maintain electrical infrastructure over a 24-month period. A full-time site team, including a contract manager and two qualified electricians, is required to ensure compliance with SANS 10142-1 standards. Deliverables include technical reports, updated electrical drawings, and operations manuals. The project is a fixed-price contract, and personnel must undergo airside safety and security training.
Annual Servicing of Fire Fighting Equipment at King Shaka Centre
Air Traffic and Navigation Services (ATNS) seeks bids for the annual inspection, testing, and certification of fire-fighting equipment at the King Shaka Operations Centre in Durban. This includes servicing fire extinguishers, hose reels, and fire hydrants, with pressure testing and a Certificate of Compliance. Qualified personnel must perform the work at the ATC Control Tower and surrounding ATNS complex. Bidders must provide all necessary labour, tools, and transport. The tender is valid for 60 days from the closing date of 17 August 2026.
Refurbishment of Aircraft Docking System at CTIA.
The Airports Company South Africa (ACSA) seeks tenders for refurbishing and reinstating support infrastructure for the Bravo and Charlie Apron Aircraft Docking System at Cape Town International Airport. The project includes civil and electrical works, such as installing structural steel masts, concrete foundations, and power supply systems. The contractor will handle design, construction, and documentation over 18 months, with a 2-month site operation period, adhering to airport safety protocols. Deliverables include As-Built drawings, maintenance schedules, and a final project report, under the NEC3 ECC Option A.