Maintenance of Fire Safety Systems at Cape Town Airport
Airports Company South Africa
In plain English
Maintenance of fire sprinkler, hose reels, and hydrant system for 24 months at Cape Town International Airport. Bidders must have a CIDB contractor grading of 4SF or higher.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites tenders for the maintenance, annual service, and inspection of fire sprinkler systems, hose reels, and hydrants at Cape Town International Airport. This contract will run for a duration of 24 months. The scope of work includes servicing booster water pumps and associated fire protection components in accordance with SANS standards and OEM requirements. Work may occur during night hours to minimize operational interference. The project involves both preventative maintenance and ad hoc repairs. Bidders must provide a comprehensive resource plan and ensure all key personnel, including the site supervisor, technicians, and assistants, meet specific registration and experience criteria. The tender is evaluated based on the 80/20 preference point system.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 4 Specialist Works (4SW)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Valid CIDB grading of 4SF or higher
- Valid SABS SANS1475 certification
- Valid SARS Tax Compliance Status
- Registered on the Central Supplier Database (CSD)
- Valid COIDA Letter of Good Standing
- Valid Public and Aviation Liability Insurance
- Technical staff must hold SAQCC Fire registration
- Valid Occupational Health and Safety (OHS) certificate
- Audited proof of company solvency
- Documented proof of relevant project experience
Contact & how to apply
Name: Sandra Sebokolodi
Email: tenders.scm11@airports.co.za
Phone: 011-723-2636
How to apply: Submit the completed bid documents and contract via email to Acsarfq@airports.co.za. Ensure the submission includes one original and one copy in sealed, clearly marked envelopes. All queries must be directed to the Service Manager, Khathulo Rabambi, or the contact person listed in the tender documents.
Related tenders
Fire System Remedial Works at Cape Town Airport.
Airports Company South Africa (ACSA) seeks a service provider for executing and supervising fire system remedial works at Cape Town International Airport. The project ensures compliance with SANS 10400 standards, involving architectural surveys, fire rational design, flow test installations, and smoke extraction systems. The 12-month contract under NEC3 Option B includes commissioning, hydraulic testing, and system flushing. Qualified personnel, including architects, engineers, and SAQCC-certified supervisors, are required. A 52-week defects liability period is included, with adherence to ACSA's environmental and safety standards.
Maintenance of Boarding Bridges at Cape Town Airport
The Airports Company South Africa (ACSA) invites tenders for a 5-year contract for maintenance, repairs, and minor refurbishment of Passenger Boarding Bridges and Aircraft Docking Systems at Cape Town International Airport. The scope includes preventative and corrective maintenance, 24-hour standby services, and spare parts management. Compliance with international aviation standards and safety protocols is required. The project mandates partnering with a Targeted Enterprise for at least 30% of the contract value and is structured as an NEC3 Term Service Contract with fixed pricing.
Building Refurbishment at Cape Town International Airport.
Airports Company South Africa (ACSA) seeks tenders for a six-month refurbishment of the Airport Management Centre at Cape Town International Airport. The project includes building upgrades such as electrical, flooring, ceiling, painting, and joinery works, following the NEC3 Engineering and Construction Short Contract model. Key tasks involve installing security doors, LED lighting, audio systems, and kitchen plumbing. Bidders must attend a compulsory site inspection on 15 July 2026. The contract requires fixed pricing and adherence to high safety and security standards, with personnel needing airport security clearance.
Electrical Contractor for Assessment and Certification at ACSA.
The Airports Company South Africa (ACSA) seeks an electrical contractor for the assessment, verification, and certification of Low Voltage electrical installations at Cape Town International Airport. The contractor will conduct audits, issue Certificates of Compliance, and maintain electrical infrastructure over a 24-month period. A full-time site team, including a contract manager and two qualified electricians, is required to ensure compliance with SANS 10142-1 standards. Deliverables include technical reports, updated electrical drawings, and operations manuals. The project is a fixed-price contract, and personnel must undergo airside safety and security training.
Supply and Delivery of Fire Suppression System Kits.
Airports Company South Africa (ACSA) seeks quotations for supplying and delivering fire suppression system service kits at O.R. Tambo International Airport. The project includes specialized valve service kits for Angus, Inbal, Reliable, Tyco, and Viking models, with 2026 ASIB date tags. The tender, RFQ 72600, requires delivery to the airport facility by 31 July 2026. Pricing must remain valid for 120 business days from the closing date.
Refurbishment of Aircraft Docking System at CTIA.
The Airports Company South Africa (ACSA) seeks tenders for refurbishing and reinstating support infrastructure for the Bravo and Charlie Apron Aircraft Docking System at Cape Town International Airport. The project includes civil and electrical works, such as installing structural steel masts, concrete foundations, and power supply systems. The contractor will handle design, construction, and documentation over 18 months, with a 2-month site operation period, adhering to airport safety protocols. Deliverables include As-Built drawings, maintenance schedules, and a final project report, under the NEC3 ECC Option A.