Decommissioning and Installation of Roller Shutter Doors at KSIA
Airports Company South Africa
In plain English
Replacement of roller shutter doors at King Shaka International Airport for 24 months. Open to registered contractors.
Always check the official documentDescription
This tender is issued by the Airports Company South Africa (ACSA) for the replacement of 17 automatic roller shutter doors at King Shaka International Airport. The project involves decommissioning, supplying, installing, and commissioning new galvanized steel doors for fire truck and light vehicle parking bays. The work must be performed in a live airport environment, requiring after-hours operations to avoid disrupting flights. The contract duration is 24 months, with a 36-month completion timeline. Key deliverables include the installation of sectional roller doors, electrical motor integration, and operational training for ACSA staff. Bidders must provide a qualified project team, including a site supervisor and technicians, and adhere to strict safety and quality management standards throughout the project lifecycle.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Registered company — An active CIPC-registered company in good standing.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 4 Mechanical Engineering (4ME)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Must hold valid CIDB contractor grading of 4ME or higher
- Must be registered on the Central Supplier Database (CSD)
- Must provide valid SARS Tax Compliance Status (TCS) PIN
- Must provide valid COIDA Letter of Good Standing
- Must provide proof of financial standing and bank letter
- Key personnel must hold relevant industry certifications and trade test qualifications
- Must provide CIPC corporate registration and shareholder identification
Contact & how to apply
Name: Tondani.Mtephe
Email: tondani.mtephe@airports.co.za
Phone: 011-000-0000
How to apply: Submit one original, one copy, and an electronic version on a USB drive to the tender box at the MSO Building, King Shaka International Airport. Ensure the package is sealed and clearly marked with the tender reference KSIA8029/2025/RFP.
Related tenders
Roller Shutter Door Replacement at Bram Fischer Airport
The Airports Company South Africa (ACSA) seeks to replace industrial roller shutter doors at Bram Fischer International Airport. The project includes removing existing doors and installing new heavy-duty steel units in various airport locations, such as the ARFF main doors and terminal buildings. Work will occur in a live operational environment, requiring night work and adherence to safety and emergency alarm integration. The contract duration is six months, with a 12-month defects liability period. Bidders must supply all mechanical and electrical components, operation manuals, and as-built drawings. Compliance with SANS and international safety standards is mandatory. The contract is fixed-price, lump-sum, and bidders must include all overheads, permit costs, and site requirements in their pricing.
Provision of Cleaning & Hygiene Services at KSIA.
This tender is for cleaning and hygiene services at King Shaka International Airport for up to four months. Issued by Airports Company South Africa, it covers cleaning of terminal buildings, parkades, and office blocks, totaling approximately 250,032 square meters. The contractor must manage 160-170 staff and comply with BCCI regulations. The tender is valid for 120 working days from the closing date of 24 July 2026.
Construction Monitoring for ACSA VIP Lounge Refurbishment.
Airports Company South Africa (ACSA) seeks professional construction monitoring services for refurbishing VIP lounges at King Shaka, Chief Dawid Stuurman, and King Phalo International Airports. The project, lasting up to 21 months, requires project management, quantity surveying, and engineering oversight. Deliverables include progress reports, health and safety files, and project close-out documentation. Work occurs outside standard airport hours, requiring a multidisciplinary team with valid professional registrations. Compliance with ACSA rules and security regulations is mandatory.
Design and Install Solar PV Plant at King Shaka Airport
The Airports Company South Africa (ACSA) seeks tenders for the design, supply, installation, commissioning, and maintenance of a 2 MWp Photovoltaic Solar Plant at King Shaka International Airport. The project includes a 36-month construction phase and a 5-year operation and maintenance period. Key tasks involve structural roof modifications, electrical integration, security system installation, and performance monitoring. The work is located at the airport's landside long-stay parking area. A compulsory site briefing is scheduled for 30 July 2026. The project requires adherence to technical standards, including 22% module efficiency and 99.5% system availability, under the NEC3 Engineering and Construction Contract. Security screening for personnel and NERSA registration are mandatory, with contractor-led training for ACSA staff.
Joint Monitoring Team for King Shaka Airport Project
Appointment of a Joint Monitoring Team of Professional Service Providers for the development of a Chemical and Flammable Liquid Store at King Shaka International Airport. The project includes architectural, structural, civil, electrical, mechanical, fire engineering, and quantity surveying services. It involves managing the project through design, procurement, construction, and close-out phases over 12 months. The scope includes training two ACSA graduate engineers, and requires adherence to security protocols as the site is a National Key Point. Issued by ACSA under an NEC3 Professional Services Contract.
Supply and Install Security Fence and Bundwalls.
Airports Company South Africa (ACSA) seeks bids for supplying, delivering, and installing security fencing and constructing bundwalls for mini-substations at O. R. Tambo International Airport. The project aims to secure electrical infrastructure against unauthorized access and fire risks. Key tasks include installing galvanized steel palisade fencing, constructing brick bundwalls, laying crushed stone, and installing safety signage and cable sleeves. The contract duration is 7 to 12 months, with a compulsory site briefing on 15 July 2026. Specialized civil and construction expertise is required, and pricing must remain fixed for the contract duration. Bidders must achieve a minimum functionality score of 70 points for further evaluation.