Refurbishment of External Building Finishes at King Phalo Airport
Airports Company South Africa
Compulsory briefing — you must attend to bid
20 August 2026 at 00:00 · King Phalo Airport
In plain English
The tender is for the provision of building external finishes refurbishment and replacement at King Phalo Airport. Only tenderers with a CIDB contractor grading of 4CE or higher may submit tender offers.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites bids for the refurbishment and replacement of external building finishes at King Phalo Airport. The project requires work to be performed primarily outside of airport operational hours, specifically between 19:00 and 04:00. Key deliverables include the successful completion of external building repairs and the submission of a detailed project plan. The tender is subject to a compulsory briefing session held at the airport. Bidders must demonstrate relevant experience through contactable references for similar projects and provide qualified personnel to execute the work. All pricing must be fixed and inclusive of all labor and material costs.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- CIDB grading (Grade 4 Civil Engineering (4CE)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Valid CIDB contractor grading of 4CE or higher
- Registered on the Central Supplier Database (CSD)
- Valid SARS Tax Compliance Status (TCS) PIN
- Valid COIDA Letter of Good Standing
Contact & how to apply
Name: Helen
Email: helen.mahlangu@airports.co.za
Phone: 079-696-4621
How to apply: Submit your completed tender documents via email to acsarfq@airports.co.za before the closing date of 01 September 2026 at 12:00 PM. Ensure all required forms are fully signed and attached.
Related tenders
Rehabilitation of Service Roads at King Phalo Airport
The Airports Company South Africa (ACSA) seeks tenders for civil engineering services at King Phalo Airport, East London. The project involves rehabilitating airside taxiway Bravo and landside service roads, including entrance upgrades, pothole repairs, and parking improvements. The consultant will manage the project from design to commissioning over two years, ensuring compliance with aviation safety, environmental, and security protocols. A skilled team, including a registered engineer and health and safety agent, is required. The project follows an NEC 3 Professional Services Contract with milestones for design, procurement, and construction monitoring.
Painting services at King Phalo Airport.
The Airports Company South Africa (ACSA) seeks tenders for a three-year contract to paint runways, taxiways, aprons, service roads, and parking areas at King Phalo Airport, East London. The work involves applying markings using professional machinery after operational hours to ensure safety. The contractor must provide a skilled team with valid airport permits and adhere to safety and environmental regulations. Payment is activity-based with annual CPI adjustments.
Roller Shutter Door Replacement at King Phalo Airport.
The Airports Company South Africa (ACSA) seeks bids for replacing roller shutter doors at King Phalo Airport. The project includes removing four existing doors, installing new motorized fire-resistant units, electrical commissioning, site management, and safety compliance over 24 months. Work must occur between 18:00 and 05:00 to avoid disrupting airport operations. Bidders should provide a detailed methodology plan, adhering to SABS standards and the NEC3 framework. Security vetting is required as the site is a National Key Point.
Design of Rainwater Harvesting at King Phalo Airport
The Airports Company South Africa (ACSA) seeks professional services to design a rainwater harvesting system at King Phalo Airport. The project aims to provide an alternative water source for terminal ablutions, ensuring business continuity. Services required include civil, mechanical, electrical, and project management over 40 months. Deliverables include feasibility studies, detailed designs compliant with the National Water Act and SANS 10400, site supervision, and project close-out documentation. The project is located in East London, with an estimated construction value of R2,571,113.00.
Terminal Building Roof Refurbishment at Chief Dawid Stuurman Airport
The Airports Company South Africa (ACSA) invites tenders for the refurbishment of the terminal building roof at Chief Dawid Stuurman International Airport. The project includes roof waterproofing, concrete roof construction, and structural extensions. Bidders must meet a minimum functionality threshold of 70 points and provide fixed pricing. A non-compulsory site inspection is on 14 August 2026, with submissions due by 28 August 2026. The evaluation follows an 80/20 price and preference point system. Successful bidders must show professional qualifications for key personnel and financial resources to execute the works.
Refurbishment of Fuel Assets at Regional Airports.
The Airports Company South Africa (ACSA) seeks proposals for engineering design, project management, and construction for refurbishing fuel assets at George, King Phalo, Bram Fischer, Kimberley, and Upington airports. The project includes mechanical, structural, civil, and electrical upgrades to bulk fuel storage and into-plane systems, such as tank refurbishment, piping modifications, and fire safety assessments. The contract is for 18 months, requiring as-built drawings and site assessments, adhering to safety and security regulations. Governed by the NEC3 Engineering and Construction Contract, pricing must remain fixed. Submissions close on 14 August 2026.