Feasibility Study on Hydrogen-Powered Mining Equipment.
SCM
In plain English
A feasibility study on converting mining equipment to hydrogen power using combustion technology is being procured. Bidders must submit fully completed proposals and be registered on the Central Supplier Database.
Always check the official documentDescription
The South African National Energy Development Institute (SANEDI) invites proposals for a feasibility study on hydrogen-powered mining equipment. The project involves analyzing hydrogen dual-fuel technology for surface mining at Tharisa Mine and underground mining at Sibanye Stillwater Mine. Key tasks include site assessments, energy consumption simulations, vehicle integration analysis, and emissions impact studies. The service provider must deliver a comprehensive technical report, a regulatory framework, an operational risk matrix, and a total cost of ownership model. The project duration is 24 weeks. Bidders must demonstrate expertise in energy engineering and finance, providing a team with relevant degrees and extensive project experience. The work must be completed within six months of the contract signature.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
Full requirements
- Must be registered on the Central Supplier Database (CSD).
- Key personnel must hold relevant certified academic qualifications.
- Must provide five signed reference letters for relevant past projects.
- Must have a collaboration plan with the Mineral Council and Hydrogen Expert Team.
Contact & how to apply
Name: SCM
Email: enquiries.procurement@sanedi.org.za
Phone: 011-038-4300
How to apply: Submit your proposal via email to 0326.procurement@sanedi.org.za. Documents must be in locked PDF format. Ensure the email subject references the bid number. The total file size must not exceed 20 MB; multiple emails are permitted if necessary.
Related tenders
Research on Dust Sources in Underground Mines.
The Mine Health and Safety Council (MHSC) seeks a service provider for a research project to assess and quantify dust sources in South African gold, coal, and diamond mines. The project includes literature reviews, gravimetric sampling, real-time monitoring, and modeling techniques to rank dust contributions. The provider will evaluate current dust control strategies and develop best practice guidelines for intake airway dust management. The project spans 18 months, involves various mine sites, and includes a stakeholder workshop in Gauteng. Deliverables include research reports, exposure profiles, and best practice guidelines.
Hydrogen Plant Maintenance at Hendrina Power Station.
Eskom seeks tenders for hydrogen plant maintenance services at Hendrina Power Station on an 'as and when required' basis over five years. The project includes preventative maintenance at various intervals, maintenance of key components, breakdown callouts, and technical training. Adherence to quality, safety, and environmental standards is required.
Hydrogen Gas Detection Systems for Pumped Storage Schemes.
Design, manufacture, supply, installation, testing, and commissioning of fixed hydrogen gas detection systems for battery rooms at Drakensberg and Ingula Power Stations. The project includes explosion-proof detection and alarm systems, integration with fire alarm and SCADA systems, and adherence to FM, Ex, and ATEX standards. Requires a registered Master Installation Electrician and follows the NEC3 ECSC framework. Includes a 12-month defect correction period and submission of as-built drawings and maintenance manuals.
Research on Reducing Silica Exposure in Gold Mines
The Mine Health and Safety Council (MHSC) seeks a service provider for a research project aimed at reducing Respirable Crystalline Silica (RCS) exposure risks associated with backfill in underground gold mines. The project will be conducted in Gauteng, the Free State, and the Northwest province. Tasks include literature reviews, backfill material characterization, RCS concentration monitoring, and evaluation of dust control measures. Deliverables include research reports, a draft guidance document, and a stakeholder workshop. The project duration is 18 months.
Research on Hearing Conservation Programs in Mining.
The Mine Health and Safety Council (MHSC) seeks a service provider to evaluate the effectiveness of Hearing Conservation Programs within the South African mining industry. The project includes a literature review, noise risk profile analysis across various mine commodities, and the development of a guidance document to improve hearing conservation practices. It will be conducted across multiple mine sites, including gold, coal, platinum, and diamond operations. Key deliverables are a project initiation report, a noise risk profile, a stakeholder workshop, and a final HCP framework. The project duration is 18 months, with 15 months for research and 3 months for administrative finalization.
Updating of Energy Performance Standards and Labelling.
The South African National Energy Development Institute (SANEDI) seeks a service provider to conduct an Ex-post Regulatory Impact Assessment for energy efficiency regulations concerning household refrigeration. The project, covering 2020 to 2025, will last six months. Deliverables include an inception report, data collection and stakeholder engagement reports, a comprehensive impact assessment, and a final policy brief. The successful bidder must analyze energy savings, environmental impacts, and socio-economic outcomes, consulting with manufacturers, retailers, and government stakeholders to evaluate current energy labeling regulations.