Feasibility Study for Offshore Gas Field Development.
HENNIE FORTUIN
In plain English
PetroSA is procuring consultancy services for a feasibility study on offshore gas fields development. Bidders must be registered on the CSD and demonstrate experience in offshore oil and gas developments.
Always check the official documentDescription
PetroSA has issued a tender for consultancy services to conduct a feasibility study for the development of the E-BK, E-AD, and E-S offshore gas fields. The project is located in Licence Block 9, approximately 85 km off the South African south coast. The successful consultant will perform multidisciplinary studies, including drilling and completion design, flow assurance, subsea production system evaluation, and process engineering. Key deliverables include a comprehensive feasibility report, technical specifications, risk assessments, and Class 2 and 3 cost estimates for future project phases. The assignment must be completed within twelve weeks of the award. Interested parties must attend a virtual briefing on 26 August 2026. Bidders must demonstrate extensive experience in offshore oil and gas developments, including subsea engineering and brownfield facility modifications, and possess a qualified multidisciplinary project team.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
Full requirements
- Must be registered on the Central Supplier Database (CSD) with valid MAAA number
- Must have an established Quality Management System
- Proven track record in offshore oil and gas projects within last ten years
- Must have access to specialist engineering and process simulation software
Contact & how to apply
Name: HENNIE FORTUIN
Email: martinhennie.fortuin@petrosa.co.za
Phone: 021-929-3211
How to apply: Applications must be submitted electronically via the PetroSA eProcurement portal. Registered users should log in with their credentials, while new users must register via the 'Not Registered Yet' link. All steps in the portal, including document uploads and questionnaire completion, must be finalized to generate a submission report.
Related tenders
Feasibility Study for Gas Power Plant Project.
PetroSA invites tenders for a feasibility engineering study for a Gas-to-Power Project at the GTL Refinery in Mossel Bay. The study will assess the viability of a 300-360 MW Combined Cycle Gas Turbine power plant using offshore gas. Deliverables include a Basis of Design report, technical feasibility studies, electrical and grid integration designs, risk registers, and an AACE Class 3 cost estimate. A virtual clarification meeting is scheduled for 20 August 2026, with registration required by 19 August 2026.
Supply and Delivery of Diving Gases and Chemicals.
This tender involves supplying diving gases and chemicals for PetroSA in Mossel Bay on a call-off basis. The supplier must maintain a one-month buffer stock and deliver high-pressure gases like Heliox and Oxygen, as well as chemical consumables such as Purafil pellets and Sodasorb granules. Transportation to the PetroSA departure point is required, and all equipment must meet safety standards (DNV 2.7-1, BS EN 12079, IMCA 0018). Deliveries must include certificates of conformity, gas composition reports, and inspection documentation. The supplier is also responsible for maintenance and recertification of rental equipment during the contract.
Saturation Dive System Refurbishment for PetroSA.
PetroSA seeks a service provider for the refurbishment, commissioning, integration, and installation of a saturation dive system in Mossel Bay. The project includes refurbishing dive chambers, winches, and control rooms, conducting marine architectural studies, and integrating the system onto a PetroSA Platform Supply vessel. The service provider must manage equipment transport and adhere to international standards such as IMO and IMCA, delivering a comprehensive Quality Control Plan. Expertise in saturation support systems and pressurized equipment is required, with a project timeline of twelve months.
Research on Gas and Skills Development in South Africa.
The Energy and Water Sector Education and Training Authority (EWSETA) seeks a public research institution for a two-year study on gas and skills development in South Africa. The study will analyze gas's role in the energy mix, identify skills gaps, and assess educational institutions' readiness for relevant training. Deliverables include a project plan, research report, evidence portfolio, and presentation. The focus is on the gas value chain and workforce preparation strategies.
Feasibility Study on Hydrogen-Powered Mining Equipment.
The South African National Energy Development Institute (SANEDI) seeks proposals for a feasibility study on hydrogen-powered mining equipment. The study will analyze hydrogen dual-fuel technology for surface mining at Tharisa Mine and underground mining at Sibanye Stillwater Mine. Tasks include site assessments, energy consumption simulations, vehicle integration analysis, and emissions impact studies. Deliverables include a technical report, regulatory framework, operational risk matrix, and cost of ownership model. The project duration is 24 weeks, and bidders must have expertise in energy engineering and finance.
Manufacture and supply of oil containment booms.
The Strategic Fuel Fund (SANPC) seeks a service provider to manufacture, supply, and deliver heavy-duty oil containment booms for the Saldanha crude oil terminal. The project includes 20 sections of 50-meter inflatable booms, inflator nozzles, and spare boom valves, meeting strict technical specifications. A project plan with a Gantt chart is required, with delivery between 10 and 19 weeks from the purchase order date, and a 12-month manufacturer warranty.