Tree Felling and Obstacle Clearance at King Shaka Airport
Airports Company South Africa
In plain English
Airports Company South Africa is procuring tree felling and obstacle clearance services at King Shaka International Airport. Bidders must comply with tax obligations and provide public liability insurance.
Always check the official documentDescription
The Airports Company South Africa (ACSA) invites bids for tree felling and obstacle clearance at King Shaka International Airport. The project involves pruning and removing various tree types, including pine, gum, and bamboo, across both landside and airside areas. Key tasks include stump treatment, waste disposal with certification, and overhanging branch removal. The contractor must provide a detailed method statement, a safety file, and ensure all personnel wear proper protective equipment. Vehicles used on-site must be under seven years old and equipped with amber lighting. The work is scheduled for weekdays between 08:00 and 16:30. Bidders must demonstrate relevant experience through three previous projects valued at over R200,000 each and provide certified qualifications for supervisors.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
- Other registration — An industry registration the tender requires (e.g. PSIRA, NHBRC, a professional or trade licence).
Full requirements
- Valid SARS Tax Compliance Status PIN or certificate
- Registered on the Central Supplier Database (CSD)
- Valid COIDA or FEMA Letter of Good Standing
- Public liability insurance cover of at least R5,000,000
- Certified tree felling or chainsaw operating qualifications for supervisors
- Three reference letters or completion certificates for similar projects
Contact & how to apply
Name: Mlungisi Mgobhozi
Email: Mlungisi.mgobhozi@airports.co.za
Phone: 032-436-6198
How to apply: Submit your application via email to acsarfq@airports.co.za. Ensure the submission is divided into at least four separate attachments, each no larger than 4MB. All pages of the bid documents must be signed or stamped.
Related tenders
Lift replacement and refurbishment at King Shaka Airport.
The Airports Company South Africa (ACSA) seeks tenders for replacing and refurbishing lifts at King Shaka International Airport over 36 months. The project includes replacing five goods lifts, modifying one trolley lift, and refurbishing 23 existing lifts. It involves decommissioning, installation, system integration, and testing, with work conducted after hours to minimize disruption. Deliverables include commissioning by a registered inspector, staff training, and as-built documentation. The contractor must manage technical aspects, including electrical and fire system interfaces, while adhering to safety and security protocols.
Power Factor Correction Equipment at King Shaka Airport.
Airports Company South Africa (ACSA) seeks tenders for designing, supplying, installing, testing, and commissioning Power Factor Correction equipment at King Shaka International Airport over 24 months. The project includes power quality studies at 12 locations, equipment procurement, and SCADA system integration. Deliverables include technical documentation, as-built drawings, operation manuals, and staff training. Compliance with IEC and IEEE standards is required. The team must include an ECSA-registered technologist, a SACPCMP or PMP-certified manager, a licensed electrician, and a registered Health and Safety Officer. Work must follow the NEC3 Contract, with a performance bond and specific insurance, including aviation liability.
Fire System Maintenance at Dawid Stuurman Airport
The Airports Company South Africa (ACSA) invites tenders for the maintenance of fire fighting and fire detection systems at Chief Dawid Stuurman International Airport. The scope includes servicing, repairs, and performance testing of fire infrastructure such as extinguishers, hydrants, sprinklers, and suppression systems. The contract duration is thirty-six months, starting upon signing. Work must comply with SANS standards and the Occupational Health and Safety Act. The contractor is responsible for maintaining system availability and providing monthly performance reports. Key personnel, including a Site Manager and qualified technicians, are required to manage site operations. All pricing must be provided in South African Rand and will be subject to CPI-based adjustments. The project requires strict adherence to airport safety protocols and permit requirements.
Installation of Preconditioned Air Units at King Shaka Airport
Airports Company South Africa (ACSA) seeks tenders for installing preconditioned air units to cool passenger loading bridges at King Shaka International Airport. The project includes design, supply, installation, and commissioning of cooling systems, with electrical and mechanical infrastructure, under the NEC3 contract model over 24 months. Key deliverables are performance verification, staff training, and as-built documentation. A compulsory site inspection is on 20 November 2026. A 10% performance bond and a 12-month defects liability period are required. Pricing must remain fixed for the contract duration.
Preventive Maintenance of Stormwater System at KPA.
The Airports Company South Africa (ACSA) seeks bids for preventive maintenance of the stormwater drainage system at King Phalo Airport. The project involves cleaning and maintaining pipes, channels, catch pits, and kerb inlets over three years. Tasks include debris removal, vegetation management, and ensuring water flow through high-pressure jetting. Work must occur during standard hours, with airside tasks outside operational times. Deliverables include bi-annual maintenance reports and adherence to safety and environmental standards. The contract uses an activity-based pricing structure. A non-compulsory briefing session is on 20 November 2026, with submissions due by 11 December 2026.
Service Provider for Septic Tank Maintenance at KPA
Airports Company South Africa (ACSA) seeks bids for a three-year contract for emptying and maintaining septic tanks at King Phalo Airport. The service includes regular tank emptying, sewer line cleaning, and necessary repairs. Waste disposal must occur at authorized facilities, with monthly progress reports required. Key deliverables include a roadworthy 4x4 vehicle, appropriate PPE, and a comprehensive safety file. Personnel must be medically fit and trained in occupational health and safety. The service covers specific airport areas, including the Main Gate, Electrical Complex, and Cargo Area. Bidders must maintain firm pricing for 120 days and comply with airport security and environmental regulations.