Assessment of Eco-Industrial Park Incentives for CSIR
CSIR
Description
The Council for Scientific and Industrial Research (CSIR) invites proposals to assess existing Eco-Industrial Park (EIP) incentives and identify new non-energy related incentives. The project aims to support EIP transformation through a review of national and industrial-park-level regulations. Key tasks include cataloging existing financial and regulatory incentives, performing a gap analysis, and assessing the impact of proposed new measures. The service provider must deliver an inception report, a draft assessment, and a final report, followed by an in-person workshop for stakeholders. The work is expected to be completed within six months.
Requirements
- Registered on the National Treasury Central Supplier Database (CSD)
- Valid Tax Compliance Status
- Relevant industry affiliations, memberships, or accreditations
Contact & how to apply
Name: SCM
Email: tender@csir.co.za
Phone: 012-841-2911
How to apply: Submit proposals electronically to tender@csir.co.za. Proposals must be sent in two separate emails: one for the Technical Proposal and one for the Pricing Proposal. Use the RFP number and description as the subject line. Cloud-based links are not accepted.
Related tenders
Panel of Co-Sourced Internal Audit Service Providers.
The Department of Science and Innovation seeks to appoint a panel of co-sourced internal audit service providers for a 36-month contract at the CSIR Campus in Pretoria. The panel will provide assurance and advisory services, including financial, operational, compliance, IT, and project audits, as well as data analytics. Key deliverables include audit engagement plans, progress reports, final audit reports, and working papers. The service provider must also implement a data analytics training program and provide mentorship for 7 internal audit staff members over the 3-year period. The tender is divided into three categories: general assurance and advisory, ICT audits, and project audits. Proposals are due by 23 June 2026 at 11:00.
Development of Incentive Framework for Industrial Spaces
The Development Bank of Southern Africa (DBSA) seeks a professional service provider to create a performance-based incentive framework. This framework is intended to improve the maturity and competitiveness of South Africa’s industrial spaces under the National Treasury Cities Support Programme, with a project duration of 24 months.
Supply and Installation of HVAC Units at CSIR Campus.
The CSIR requests quotations for the supply, installation, and commissioning of two 72kW inverter-type rooftop HVAC units at Building 11 on the Scientia Campus. The project involves removing existing units, modifying ductwork, performing electrical upgrades, and verifying slab capacity. Completion is required within four months of the purchase order, with a minimum COP of 3.0, IP66 rating, and a 12-month guarantee. A compulsory site inspection is on 12 June 2026, with all work finalized by 19 June 2026.
Supply and Installation of Storage Devices for CSIR.
The CSIR requires the supply, delivery, configuration, and installation of two enterprise storage devices and two enterprise storage expansion enclosures at their Pretoria office. Delivery must be completed within 8 weeks of receiving a purchase order.
Supply and delivery of graphic design services to CSIR.
The CSIR requires graphic design services for the ISEP and its projects, including logo design, web assets, social media content, print materials, presentations, illustrations, and environmental design. Services will be procured for 30 hours per month over 12 months.
Underwater Measurement Capabilities and Technical Expertise RFP.
The CSIR seeks a partner to develop and test maritime technology and underwater sensors in Stellenbosch over five years. The work includes designing, developing, and testing underwater systems and sensors, with activities such as research, performance evaluations, prototype testing, and compiling test reports. Facilities must be within 200km of CSIR Stellenbosch. The closing date is 08 June 2026.