Quotation for Lagging Installation on Furnace Ducting.
Catherine Matima
In plain English
Lagging on furnace off-gas extraction ducting is being modified and installed. Bidders must have CIBD 1ME registration.
Always check the official documentDescription
The South African Nuclear Energy Corporation (Necsa) invites quotations for the Area 26 Smelter Project. The work involves modifying existing 50 mm lagging material to 25 mm thickness and installing it onto the furnace off-gas extraction ducting for Furnace 1 and Furnace 2. The contractor must also install galvanised protective covers over the ducting. All necessary materials are provided on-site. The project requires the submission of a safety file. The closing date for submissions is 23 June 2026 at 17:00.
What you need to qualify
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- B-BBEE certificate — A B-BBEE certificate or sworn affidavit confirming your contribution level.
- CIDB grading (Grade 1 Mechanical Engineering (1ME)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Must hold valid CIDB grading of 1ME
- Must provide valid SARS Tax Clearance Certificate
- Must provide valid B-BBEE Certificate or sworn affidavit
- Must provide valid COID Letter of Good Standing
Contact & how to apply
Name: Catherine Matima
Email: Catherine.Matima@necsa.co.za
Phone: 012-305-3027
How to apply: Quotations must be submitted via email to catherine.matima@necsa.co.za by 17:00 on 23 June 2026.
Related tenders
Supply and Install Furnace Spout and Lid Lining.
Necsa requests quotations for the supply, delivery, and installation of a 4-ton furnace spout and the lining of a furnace lid at their facility. This project requires specialized industrial maintenance and precasting services. Submissions close on 18 June 2026 at 10:00, and quotations must remain valid for 60 days. A site briefing is optional. Pricing should be fixed, firm, and inclusive of all taxes and necessary costs. Evaluation will be based on functionality and the 80/20 preferential procurement system for orders over R30,000.
HVAC Services for Luthuli Museum.
The Luthuli Museum in Groutville seeks a qualified HVAC service provider for the supply, delivery, and installation of new air conditioning units. The project includes removing and repositioning existing units, disposing of faulty equipment, and installing new inverter-type systems at various locations within the museum. The successful bidder must ensure compliance with electrical safety standards and provide a 5-year warranty on new units. Completion is required within 14 days of appointment, with a compulsory briefing session on 19 June 2026.
Supply System Control Valves for Plasma Gas Project.
Supply system control valves for the Low-Level Waste Plasma Gasification Demonstration Project at Necsa, Pelindaba, North-West Province. Refer to the attached Valve List and P&IDs. Closing date: 12 June 2026.
Panel of Contractors for HVAC Repairs and Maintenance.
This tender involves work on air conditioning systems, including replacing refrigerant piping, lagging, and isolation, topping up compressor oil, painting plant rooms and architraves, and providing corrosion protection. It includes removing existing materials, supplying new ones, connecting and installing items, and painting surfaces.
Supply and Delivery of Nitrogen Gas and Cylinder Rental
This tender involves the supply and delivery of nitrogen gas, along with the rental of 10 x 11 kg nitrogen gas cylinders, for a five-year period for National Transmission Company South Africa SOC Ltd – Apollo & CS.
Supply and Installation of HVAC Units at CSIR Campus.
The CSIR requests quotations for the supply, installation, and commissioning of two 72kW inverter-type rooftop HVAC units at Building 11 on the Scientia Campus. The project involves removing existing units, modifying ductwork, performing electrical upgrades, and verifying slab capacity. Completion is required within four months of the purchase order, with a minimum COP of 3.0, IP66 rating, and a 12-month guarantee. A compulsory site inspection is on 12 June 2026, with all work finalized by 19 June 2026.