Construction & Engineering 07 Sept 2026Borehole Piping Installation at Transnet Port Terminals. Transnet Port Terminals seeks bids for installing borehole piping at the Port of Port Elizabeth. The project includes designing and installing a water system to connect a borehole to the Dust Suppression System and storage tanks. Tasks involve laying 300m of piping, installing valves and filters, building a tank platform, and repairing storage tanks. The contractor must conduct hydraulic calculations, system testing, and provide staff training. Deliverables include design drawings, maintenance manuals, and commissioning reports. The project requires engineering, electrical, and plumbing expertise.
Port of Port Elizabeth, Green Street, North End - North End - Port Elizabeth - 6000R 2 500 000