VVUZA

1GB tenders in KwaZulu-Natal

Open CIDB 1GB (Grade 1 General Building) construction tenders in KwaZulu-Natal. Free to view, no signup. See all 1GB tenders or all tenders in KwaZulu-Natal.

Construction & Engineering01 Sept 20263d left

Roof Waterproofing for Harding Standby Quarters

The Ugu District Municipality seeks bids for roof waterproofing services at Harding Standby Quarters. The project includes pressure washing a 341m2 roof, removing and replacing IBR sheets, and applying liquid rubber sealant. Materials must be SABS approved, and the contractor must provide workmanship guarantees and manufacturer warranties. Completion must adhere to professional standards. The tender closes on 02 September 2026, with a compulsory site meeting on 28 August 2026.

96 Marine Drive, Oslo Beach Phase 3R 150 000
Construction & Engineering02 Sept 20264d left

Installation of Fencing at Scottburgh Wastewater Treatment Works

The Ugu District Municipality invites bids for the installation of 46 meters of new concrete palisade fencing and a 6-meter by 2-meter galvanized industrial gate at the Scottburgh Wastewater Treatment Works. The project includes the removal of existing fencing, trenching, concrete work, and repair of gate railings. Completion is expected within two to four weeks. A compulsory site meeting is scheduled for 27 August 2026.

96 Marine Drive, Oslo Beach Phase 3R 150 000
Construction & Engineering02 Sept 20264d left

Carpentry Work for Margate Fleet Offices

The Ugu District Municipality requires a service provider for carpentry and maintenance at Margate Fleet Offices, including cupboard shelving, cabinet refurbishment, and desk repairs. Work must meet SABS/SANS standards, with completion in one month. A site meeting is on 31 August 2026, and submissions are due by 02 September 2026.

96 Marine Drive, Oslo Beach Phase 3R 150 000
Cleaning & Maintenance04 Sept 20266d left

Office Space Maintenance at Connor Street and Ugu Main Offices

The Ugu District Municipality invites bids for office maintenance services at Connor Street and Ugu Main offices, including electrical and data cabling installations, basement power upgrades, carpentry work, and plumbing services. The contract is short-term, expected to be completed within one month. A compulsory site briefing is on 02 September 2026 at the Ugu Main Office.

96 Marine Drive, Phase 3, Oslo BeachR 250 000