7EP tenders in Mpumalanga

Open CIDB 7EP (Grade 7 Electrical Engineering (Infrastructure)) construction tenders in Mpumalanga. Free to view, no signup. See all 7EP tenders or all tenders in Mpumalanga.

Electrical & Plumbing15 Sept 2026

Replacement of Lights at Kusile Power Station

This tender involves replacing traditional lighting with LED systems at Kusile Power Station over 9 months. It includes removal of old lights, installation of new LED units, and lighting distribution boards. Key tasks are commissioning, lighting surveys, and documentation submission. Work areas include Boiler, Turbine, Water Treatment, and Compressor plants. Issued by Eskom Holdings SOC Ltd.

R545 KENDAL/BALMORAL RD, Kusile Power Station-Delmas-WITBANK-1035R 25 000 000
Electrical & Plumbing17 Sept 2026

Construction of Loskop Bulk Water Supply Scheme

The Nkangala District Municipality invites tenders for Work Package 6B of the Loskop Regional Bulk Water Supply Scheme. This project involves installing an Eskom Medium Voltage bulk electrical connection, including the Chickadee line section to Pump Stations 3 and 4. It includes site preparation, excavation, pole planting, conductor stringing, and electrical equipment installation. Located in Thembisile Hani, Steve Tshwete, and Elias Motsoaledi Local Municipalities, Mpumalanga, the project requires adherence to Eskom standards and SANS specifications. The contract duration is 180 days for completion, with a 365-day defects liability period. The contractor must manage construction programmes using Microsoft Projects and ensure site security, health and safety compliance, and provide specific site facilities for the engineer.

2A Walter Sisulu-Aerorand-Middelburg-1050R 50 000 000
Electrical & Plumbing17 Sept 2026

Construction of Loskop Bulk Water Supply Scheme.

The Nkangala District Municipality invites tenders for the construction of the Loskop Regional Bulk Water Supply Scheme, specifically Work Package 6C. This involves Eskom MV bulk electrical connections, including Hare and Mink line sections to Pump Stations 3 and 4. Key activities include site establishment, excavation, pole planting, electrical structure installation, conductor stringing, and asset commissioning. The project must be completed within 180 days and is located in Mpumalanga Province, covering Thembisile Hani, Steve Tshwete, and Elias Motsoaledi Local Municipalities. Compliance with Eskom standards and the Occupational Health and Safety Act is required.

2A Walter Sisulu-Aerorand-Middelburg-1050R 50 000 000