Electrical & Plumbing 07 Sept 2026Lithium-Ion Battery Installation at Kimberley and George Airports. Airports Company South Africa (ACSA) seeks a service provider for the design, supply, installation, commissioning, and maintenance of Lithium-Ion Battery Energy Storage Systems at Kimberley and George Airports. The project aims to reduce grid dependency and operational costs through smart grid integration, including site assessments, engineering design, construction, and a 60-month maintenance plan. Deliverables include site plans, electrical schematics, commissioning reports, and O&M manuals. The contract duration is 36 months, with 12 months for construction and 24 months for the defects liability period. Compliance with South African Grid Codes and SANS standards is required, and all designs must be certified by ECSA-registered professionals. The project includes a 50% Contract Participation Goal, with 10% subcontracting to local black-owned EMEs or QSEs.
George Airport ACSA Offices, 1st Floor, Terminal Building--George-8000R 45 000 000