Construction of Reinforced Concrete Ramp at Uithoek.
Transnet
Compulsory briefing — you must attend to bid
16 September 2026 at 10:00 · Cnr of Lyell and Alexandra Street Engineering building Ladysmith 3370
In plain English
Construction of a reinforced concrete ramp at Uithoek km 129 under Ladysmith Depot. Eligible bidders must be registered on the National Treasury's Central Supplier Database.
Always check the official documentDescription
Transnet Rail Infrastructure Manager invites bids for the construction of a reinforced concrete ramp at Uithoek, Ladysmith. The project involves site preparation, sub-base construction, and the pouring of a 50m by 4m concrete road surface. The contractor must also manage site security and rehabilitation. Work is scheduled to commence on 12 October 2026 and must be completed by 18 December 2026. Bidders must attend a compulsory clarification meeting and site visit on 16 September 2026 in Ladysmith. The contract follows the NEC3 Engineering and Construction standards.
What you need to qualify
- CSD registration — Registration on the Central Supplier Database — required to do business with government.
- Tax clearance — A valid SARS tax compliance status (PIN) showing your tax affairs are in order.
- B-BBEE certificate — A B-BBEE certificate or sworn affidavit confirming your contribution level.
- CIDB grading (Grade 1 Civil Engineering (1CE)) — A Construction Industry Development Board grade in the right class of works.
- Letter of Good Standing — COID registration and a Letter of Good Standing from the Compensation Fund.
Full requirements
- Valid Tax Clearance Certificate and TCS PIN
- Valid B-BBEE Certificate or sworn affidavit
- Valid CIDB registration of 1CE or higher
- Registered on the Central Supplier Database (CSD)
- Valid Letter of Good Standing from the Compensation Fund
- Proof of relevant insurance coverage
Contact & how to apply
Name: Thembinkosi Ngcobo
Email: thembinkosi.ngcobo@transnet.cet
Phone: 031-361-4023
How to apply: Applications must be submitted electronically via the Transnet e-Tender Submission Portal at https://transnetetenders.azurewebsites.net. Bidders must register a profile, log an intent to bid, and upload all required documents at least one day before the closing date of 25 September 2026.
Related tenders
Construction of concrete slab and trench line at Science Centre.
The National Research Foundation (NRF-SAASTA) seeks a service provider with a valid CIDB Grade 1 CE or higher to construct a steel-reinforced concrete slab and a 65-meter trench line at the Albertina Nontsikelelo Sisulu Science Centre in Cofimvaba. The project includes excavation, compacted gravel installation, timber formwork, steel reinforcement, and casting 25 MPa concrete. A 32 mm conduit pipe with a draw wire must be installed, and the site restored through backfilling. Work starts in October 2026, with a compulsory site visit on 16 September 2026. Bids are due by 25 September 2026.
Concrete repairs in Durban drydock.
Transnet National Ports Authority seeks tenders for concrete repairs inside the drydock at the Port of Durban. The project includes demolishing existing concrete, surface preparation, pouring 30MPa concrete, and installing stainless steel handrails and electrical lighting. Contractors must manage dewatering and create a dry workspace using sandbags. The contract lasts six months, with an eight-month completion timeline. Work occurs at the Bayhead precinct, Monday to Friday, 07:30 to 15:30. Compliance with SANS concrete and welding standards is required, using Grade 316L stainless steel. Bidders must provide a Project Manager, General Foreman, and a SACPCMP-registered Safety Officer. Environmental and safety plans must be approved by Transnet. The tender follows the NEC3 Engineering and Construction Contract (Option B).
Special Maintenance of Mbombela Traffic Control Centres.
SANRAL invites tenders for the special maintenance of the Mbombela Traffic Control Centres and laybys on National Routes N4, R38, and R570 in Mpumalanga. The project involves pavement repairs, kerb replacement, road sign replacement, line marking reinstatement, and installation of concrete barriers and drainage. The duration is 15 months, including a 3-month mobilization. A compulsory virtual briefing is on 16 September 2026, and the tender closes on 7 October 2026 at 12:00 pm.
Completion of Mhlatuze River Bridge No. 3837.
The KwaZulu-Natal Department of Transport seeks bids for completing the Mhlatuze River Bridge No. 3837 on District Road 2238 in King Cetshwayo and Zululand Districts. The project includes constructing a reinforced concrete dual-lane bridge, building abutments and piers, road re-alignment, earthworks, drainage, and installing road safety features. The project duration is 8 months, requiring expertise in labour-intensive construction and local enterprise development. A compulsory clarification meeting is on 10 September 2026 at the Department of Transport office in Eshowe.
Special Maintenance of Emalahleni Traffic Control Centres.
SANRAL invites tenders for special maintenance of Emalahleni Traffic Control Centres and laybys on national routes N4, N11, R35, R38, R555, and R575 in Mpumalanga. The work includes pavement rehabilitation, crack sealing, asphalt surfacing, and jointed concrete pavements construction. Routine maintenance tasks such as grass cutting, drain cleaning, and fencing repair are also included. The contract is for 15 months, with a 3-month mobilization period. A compulsory virtual briefing is on 15 September 2026. The main contractor must perform specific work sections for 60 months, with 30% subcontracting to local black-owned enterprises. Compliance with SANS standards and the SADC Road Traffic Signs Manual is required.
Supply and Installation of Fencing at Ladysmith Depot
Transnet Rail Infrastructure Manager invites bids for the supply and installation of galvanised barbed wire fencing at four sites of the Ladysmith depot: Wesselsnek, Umbulwana, Smith’s Crossing, and Frere. The project aims to prevent animal trampling on railway lines and requires the contractor to provide all labour, materials, and machinery. Work includes site clearing, installing Y-standards, steel droppers, and concrete straining posts. The project starts on 25 September 2026 and must be completed by 31 November 2026. A compulsory site briefing will be held on 08 September 2026 in Ladysmith.